Radio communication system in an underground mine is one of the very essential systems for the underground mine. It is required that the radio communication system must be reliable from the starting to construct the underground mine to the closure of the mine. However, underground mine radio communication systems reliability is required to be tested on an active radio communication system in a real environment. In the study was suggested a new research methodology that is studied reliability using dynamic system modeling on Vensim software instead of traditional method to study the reliability of radio communication systems calculating large-scale differential equations. In other words, we suggest a new research methodology. The Motorola Dimetra (TETRA) radio communication system's availability readiness information was used to simulate the reliability of the underground mine radio communication system probability of reliability using Vensim software for system dynamic modeling.Also, the factors that affect the reliability of underground mining radio communication systems was studied. The study was determined factors that affect the underground mine radio communication system from the following risks. The study was in the examples of the Oyu Tolgoi underground mine. The factors that affect the reliable operation of the underground mine radio communication system were determined using the failure statistics of TETRA radio communication system in the Oyu Tolgoi mine in 2015-2018.
Keywords:
Subject: Computer Science and Mathematics - Algebra and Number Theory
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.
Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.