Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant level |
---|---|---|---|---|---|---|---|---|---|---|
XR | Reasons of Claims | |||||||||
XR19 | 0.815 | 2 | 1 | 63.85 | 22 | 31.4 | 52.06 | 19 | 1 | High |
XR31 | 0.788 | 11 | 2 | 65.77 | 35 | 41.9 | 51.86 | 23 | 2 | High |
XR28 | 0.748 | 41 | 8 | 67.31 | 34 | 40 | 50.35 | 33 | 3 | High |
XR18 | 0.738 | 54 | 11 | 68.08 | 30 | 41 | 50.27 | 34 | 4 | High |
XR1 | 0.785 | 12 | 3 | 62.69 | 20 | 47.6 | 49.19 | 38 | 5 | High |
XR2 | 0.785 | 12 | 3 | 62.69 | 28 | 44.8 | 49.19 | 38 | 5 | High |
XR7 | 0.721 | 68 | 16 | 65.58 | 35 | 42.9 | 47.29 | 50 | 7 | High |
XR5 | 0.767 | 23 | 5 | 60.58 | 21 | 31.4 | 46.48 | 56 | 8 | High |
XR27 | 0.763 | 25 | 6 | 60.77 | 28 | 43.8 | 46.39 | 57 | 9 | High |
XR4 | 0.748 | 41 | 8 | 61.92 | 29 | 41 | 46.32 | 58 | 10 | High |
XR8 | 0.727 | 65 | 15 | 63.08 | 28 | 41 | 45.85 | 59 | 11 | High |
Region | Average Dispute Value (US$ millions) | Average Length of Dispute (Months) | ||||||
2014 | 2015 | 2016 | 2017 | 2014 | 2015 | 2016 | 2017 | |
North America | 29.6 | 25 | 21 | 19 | 16.2 | 13.5 | 15.6 | 17.7 |
UK | 27 | 25 | 34 | 34 | 10 | 10.7 | 12 | 10 |
Continental Europe | 38.3 | 25 | 19 | 29.5 | 18 | 18.5 | 14.1 | 18.1 |
Middle East | 76.7 | 82 | 56 | 91 | 15.1 | 15.2 | 13.7 | 13.5 |
GLOBAL AVERAGE | 42.9 | 39.25 | 32.5 | 43.375 | 14.825 | 14.475 | 13.85 | 14.825 |
Rank | Method and Advice |
---|---|
1 | Studying and reviewing all contract documents; BOQ, drawing, specification, general and special conditions to make sure no inconsistent before tendering |
2 | Good planning and enough studying for all project needed along project cycle |
3 | Preparing complete drawing and its detail professionally, and no omission or ambiguity |
4 | Awarding the bid to qualified contractor" financially and technically" for the specified project, not the lowest price. |
5 | Overcome ambiguity in contract documents, balance contract, and describing items in BOQ precisely |
6 | Quantities in contract must be precisely and cover all project works. |
7 | Possession supervision team enough experience weather technically or in management of contract in construction projects. And ability for design making in a proper time. |
8 | Determining the specification for the used material according to codes and proper tests, and approval alternatives equal in specification in local market. |
9 | Submitting a concrete time schedule for the execution of the project and making updating and documenting events on schedule parallel with issuing payments. |
10 | Adequate coordination between all the parties involved in construction projects in and avoiding stack holder interference. |
Problems in Identification of Claims | Contractors Ranking | Consultants Ranking |
---|---|---|
Lack of awareness of site staff to notice a claim. | 1 | 2 |
Insufficient contract knowledge by site staff. | 2 | 4 |
Insufficient time due to high workload. | 3 | 5 |
Insufficient skilled personnel for detecting a claim. | 4 | 1 |
Difficulties in detecting any problems during the work due to high work-load. | 5 | 6 |
Poor communication between site and head office. | 6 | 3 |
Inaccessibility of documents used for identifying a claim. | 7 | 8 |
Ambiguous line of responsibility as to who should detect a claim. | 8 | 7 |
Ambiguous procedures in claim identification. | 9 | 9 |
Problems in Identification of Claims | Contractors Ranking | Consultants Ranking |
---|---|---|
Verbal instruction by owner. | 1 | 2 |
Some information/instruction is not kept in writing. | 2 | 1 |
Ineffective record-keeping system. | 3 | 3 |
Inaccurate recorded information. | 4 | 4 |
Inaccessibility of documents when needed. | 5 | 6 |
Overdue in retrieving the needed document. | 6 | 5 |
No standard form used to record the data during construction. | 7 | 7 |
No computerized documentation system. | 8 | 8 |
High cost associated with retrieving required information. | 9 | 9 |
Problems in Quantification of Claims | Contractors Ranking | Consultants Ranking |
---|---|---|
Unavailability of records used to analyze and estimate the potential recovery. | 1 | 1 |
Insufficient time to thoroughly examine claim due to high workload. | 2 | 3 |
Poor communication to gather the required information to analyze a claim. | 3 | 2 |
Lack of legal/contract to establish the base on which the claim stands. | 4 | 4 |
Ambiguous procedures for claim examination. | 5 | 6 |
No standard formula used to evaluate the impacts and calculating damages. | 6 | 8 |
Ambiguous responsibility as who should evaluate the amount of recovery. | 7 | 5 |
Unrealistic formula used to calculate damages. | 8 | 7 |
Insufficient computerized machines to facilitate the calculation. | 9 | 9 |
Problems in Presentation of Claims | Contractors Ranking | Consultants Ranking |
---|---|---|
Inaccessibility of relevant documents to submit along with the claim | 1 | 1 |
Insufficient skilled staff in preparing a claim submission. | 2 | 2 |
Poor communication in presenting a claim. | 3 | 4 |
Insufficient time to thoroughly prepare claims due to high workload. | 4 | 3 |
Ambiguous responsibility to the person that prepare the full report of claim presentation. | 5 | 6 |
No standard format of a claim submission. | 6 | 7 |
Ambiguous procedures in preparation of claim presentation. | 7 | 5 |
Problems in Negotation of Claims | Contractors Ranking | Consultants Ranking |
---|---|---|
Disagreement arising during negotiation | 1 | 1 |
Unsatisfactory evidence to convince other parties. | 2 | 2 |
Poor negotiation skills. | 3 | 3 |
Adversarial relationship with other parties. | 4 | 4 |
Inadequate time due to high workload. | 5 | 5 |
Difficult to settle without any litigation or Arbitration. | 6 | 6 |
Code | Attributes |
---|---|
X | Claim Management Planning |
XR | Reasons of Claims |
XR1 | Project execution time is short with lack of (site investigation, tender and contract documents). |
XR2 | Acceptance of imprecise tender offers with lack of (clarifications, negotiations and recording of changes). |
XR3 | Changes arising from local authority sources. |
XR4 | Lack of experiences for designers, contract administrators and contractors. |
XR5 | Sudden swings in economic and market conditions. |
XR6 | Unforeseen site conditions. |
XR7 | Frequent changes and/or variations by the client. |
XR8 | Poor communications between project participants |
XR9 | Procurement problems |
XR10 | Unbalanced risk allocation. |
XR11 | Unrealistic planning and specifications |
XR12 | Suspensions issues |
XR13 | Unfavorable weather conditions |
XR14 | Indecisive management. |
XR15 | Separate contracts (coordination problems). |
XR16 | Untimely approvals. |
XR17 | Poor briefing. |
XR18 | The owner changes his mind during construction |
XR19 | Poor financial arrangement, leading to late payments |
XR20 | Owner's reluctance to each decision that might be criticized |
XR21 | Using an unstudied design and elements for the first time |
XR22 | Misinterpretation of construction documents |
XR23 | Lack of procedure to correct errors between owner, designer and contractor |
XR24 | Conflict management |
XR25 | Contractor inability for site supervision and management |
XR26 | Engineer's satisfaction clauses |
XR27 | Design errors, omissions and contradictions in documents |
XR28 | Payment delays on changing orders |
XR29 | Price determination on change order. |
XR30 | Currency fluctuations |
XR31 | Lack of payment certification guarantees and bonds and cash flow |
XR32 | Unclear employer applications and responsibilities of all the other parties |
XR33 | Constructive acceleration |
XR34 | Non-compliance with professional ethics in construction |
XM | Claims prevention / Mitigation |
XM1 | Precise scope, risk allocated and well executed contract availability |
XM2 | Establishment of good project plan |
XM3 | Good communication with all stakeholders |
XM4 | Identifying and managing the factors that may have negative impact on the project. |
XM5 | Early recognition of potential problems |
XM6 | Creating a collaborative work environment (project partnering). |
XM7 | Clear and balanced contract terms and conditions regarding changes, claims and disputes resolution. |
XM8 | Conducting an integrated change control |
XM9 | Change management plan establishment |
XM10 | Continual updating of project schedule |
XM11 | Conducting studies for constructability and maintenance review. |
XM12 | Clear procedure for (RFI) Request for Information. |
XM13 | Commitment to periodic progress reports |
XM14 | Prequalification process |
XM15 | Good project documentation. |
XM16 | Creating Specific Claim Litigation Prevention Techniques. |
XM17 | Good planning of the contract and relying on a culture of win-win for all parties. |
Y | Problems in claim process (Monitoring and Controlling). |
YJ | Claims Identification. |
YJ1 | Lack of methodology for claims management. |
YJ2 | Poor communication between site and head office. |
YJ3 | Lack of documentation |
YJ4 | Lack of Clarity of contract provisions relating to change order, changed conditions, schedules preparation and submission, and appropriate notice requirements. |
YJ5 | Lack of clarity of the scope. |
YJ6 | No clear procedure for managing claim. |
YJ7 | Claim management section /or team is not clearly assigned. |
YJ8 | Lack of awareness of site staff to notice a claim. |
YJ9 | Inadequate time due to high workload. |
YJ10 | The impact of the claims on project schedule not documented. |
YJ11 | Lack of advice from experts to see if the claim is valid or not. |
YJ12 | Lack of preparing and submitting a complete statement of the claim in accordance with contract provision. |
YJ13 | Inadequate care about rising claims. |
YD | Claims Documentation |
YD1 | Verbal instruction by owner has not documented. |
YD2 | Ineffective record-keeping system. |
YD3 | Inaccessibility to documents when needed. |
YD4 | Overdue in retrieving the needed document |
YD5 | No standard form used to record the data during construction |
YD6 | High cost associated with retrieving required information. |
YQ | Claims Quantification |
YQ1 | Poor study and non-verification of claims |
YQ2 | Lack of documentation |
YQ3 | Ambiguous procedures in notice preparation |
YQ4 | Lack of clarifications requests about contract documents discrepancy |
YQ5 | Insufficient time to thoroughly prepare the notice due to high workload |
YQ6 | Poor schedule analysis to demonstrate the claim impact |
YQ7 | Prescribed time in the contract is too short |
YQ8 | Quantification problems |
YQ9 | Poor communication/instruction to proceed with submitting the notice. |
YQ10 | Unclear responsibility for preparing the claim notice |
YQ11 | Errors in quantities measurement for claimed work. |
YQ12 | Errors in cost estimation for claimed work |
YQ13 | Ignorance of claims rules and contract law |
YQ14 | Presence of concurrent claims |
YP | Claims Presentation |
YP1 | Inaccessibility for relevant claim documents |
YP2 | Insufficient skilled staff in preparing a claim submission |
YP3 | Poor communication in presenting a claim |
YP4 | Insufficient time to prepare claims |
YP5 | No assignment for a responsible person for preparing the full report of claim presentation |
YP6 | No standard format of a claim submission |
YP7 | Ambiguous procedures in preparation of claim presentation |
YP8 | Submissions of incomplete documents |
YN | Claims Negotiation |
YN1 | Disagreement arising during negotiation. |
YN2 | Unsatisfactory evidence to convince other parties |
YN3 | Poor negotiation skills |
YN4 | Adversarial relationship with other parties |
YN5 | Inadequate time due to high workload. |
YN6 | The difficulty of settling the claim without any litigation or arbitration. |
YR | Claims Resolution |
YR1 | Statement of claims, contract and Claims quantifications are not taken into consideration |
YR2 | Expert knowledge and fully documented certified claims are not taken into consideration |
YR3 | Lack of negotiating skill |
YR4 | Lack of specification litigation prevention techniques (independent natural) |
YR5 | Non-availability of estimated cost of claim |
YR6 | Lack of expert report or Claim assessment |
YR7 | Balanced contracts such as FIDIC and ECC contracts are not used. |
YR8 | The terms of contract don't focus on good management and effective risk distribution |
YR9 | Contract terms are inflexible for using a wide range of contracting strategies. |
YR10 | The roles and responsibilities of contracting parties are not identified |
No. | Filed | Cronbach's Alpha Value | level |
---|---|---|---|
1 | For the entire questionnaire in terms of (impact). | 0.986 | High internal Consistency |
2 | for the entire questionnaire in terms of (probability) | 0.980 | High internal Consistency |
3 | for the entire questionnaire in terms of both (impact and probability) | 0.984 | High internal Consistency |
Importance | Very Low | Low | Moderate | High | Very High |
---|---|---|---|---|---|
From | Up to 20% | 20% | 40% | 60% | 80% |
To | 40% | 60% | 80% | 100% |
Importance | Very High | High | Moderate | Low | Very Low | |
---|---|---|---|---|---|---|
From | Up to 20% | 60% | 40% | 20% | 80% | |
To | 80% | 60% | 40% | 100% | ||
FAII Value | From | 24.86 | 45.46 | 38.59 | 31.78 | 52.32 |
To | 31.77 | 52.31 | 45.45 | 38.58 | 59.17 |
Code | RII | RII Rank | RII Rank/ Group | FI | FI Rank | FI Rank / Group | FAII | FAII Rank | FAII Rank / Group | Factor Levels |
---|---|---|---|---|---|---|---|---|---|---|
YN3 | 0.77 | 21.00 | 1 | 76.92 | 46.00 | 43.80 | 59.17 | 1 | 1 | very high |
YN4 | 0.76 | 26.00 | 2 | 76.15 | 31.00 | 29.50 | 57.99 | 2 | 2 | very high |
YR7 | 0.76 | 30.00 | 1 | 75.96 | 38.00 | 36.20 | 57.70 | 3 | 1 | very high |
YN1 | 0.75 | 34.00 | 3 | 75.38 | 41.00 | 39.00 | 56.83 | 4 | 3 | very high |
YN2 | 0.75 | 37.00 | 4 | 75.19 | 41.00 | 39.00 | 56.54 | 5 | 4 | very high |
YR1 | 0.75 | 44.00 | 2 | 74.62 | 44.00 | 41.90 | 55.67 | 6 | 2 | very high |
YR3 | 0.74 | 46.00 | 3 | 74.42 | 43.00 | 41.00 | 55.39 | 7 | 3 | very high |
YR4 | 0.74 | 46.00 | 3 | 74.42 | 34.00 | 32.40 | 55.39 | 7 | 3 | very high |
XM3 | 0.80 | 5.00 | 4 | 67.88 | 24.00 | 35.20 | 54.57 | 9 | 1 | very high |
YJ10 | 0.78 | 16.00 | 4 | 70.00 | 36.00 | 33.30 | 54.38 | 10 | 1 | very high |
YR6 | 0.74 | 56.00 | 5 | 73.65 | 42.00 | 40.00 | 54.25 | 11 | 5 | very high |
YR10 | 0.74 | 57.00 | 6 | 73.46 | 44.00 | 41.90 | 53.97 | 12 | 6 | very high |
YR2 | 0.73 | 61.00 | 7 | 73.27 | 29.00 | 27.60 | 53.68 | 13 | 7 | very high |
YD1 | 0.79 | 12.00 | 1 | 68.08 | 37.00 | 32.40 | 53.41 | 14 | 1 | very high |
YJ8 | 0.76 | 32.00 | 7 | 70.19 | 38.00 | 38.10 | 53.05 | 15 | 2 | very high |
YR8 | 0.73 | 65.00 | 8 | 72.69 | 41.00 | 39.00 | 52.84 | 16 | 8 | very high |
XM7 | 0.81 | 3.00 | 2 | 64.81 | 24.00 | 29.50 | 52.34 | 17 | 2 | very high |
XM2 | 0.81 | 3.00 | 2 | 64.62 | 29.00 | 40.00 | 52.19 | 18 | 3 | High |
XR19 | 0.82 | 2.00 | 1 | 63.85 | 22.00 | 31.40 | 52.06 | 19 | 1 | High |
YQ13 | 0.78 | 18.00 | 1 | 67.12 | 33.00 | 29.50 | 52.01 | 20 | 1 | High |
YR5 | 0.72 | 68.00 | 9 | 72.12 | 34.00 | 32.40 | 52.01 | 21 | 9 | High |
YP2 | 0.77 | 21.00 | 1 | 67.50 | 36.00 | 42.90 | 51.92 | 22 | 1 | High |
XR31 | 0.79 | 11.00 | 2 | 65.77 | 35.00 | 41.90 | 51.86 | 23 | 2 | High |
YR9 | 0.72 | 71.00 | 10 | 71.92 | 42.00 | 40.00 | 51.73 | 24 | 10 | High |
YJ3 | 0.80 | 7.00 | 1 | 64.62 | 29.00 | 37.10 | 51.57 | 25 | 3 | High |
XM1 | 0.79 | 10.00 | 7 | 65.19 | 32.00 | 37.10 | 51.53 | 26 | 4 | High |
XM5 | 0.82 | 1.00 | 1 | 62.88 | 29.00 | 41.90 | 51.40 | 27 | 5 | High |
XM10 | 0.77 | 20.00 | 9 | 66.15 | 41.00 | 32.40 | 51.01 | 28 | 6 | High |
XM16 | 0.80 | 6.00 | 5 | 63.65 | 29.00 | 29.50 | 50.92 | 29 | 7 | High |
XM15 | 0.78 | 16.00 | 8 | 65.38 | 26.00 | 38.10 | 50.80 | 30 | 8 | High |
YP7 | 0.71 | 76.00 | 6 | 71.15 | 36.00 | 34.30 | 50.63 | 31 | 2 | High |
YJ4 | 0.79 | 9.00 | 2 | 63.85 | 24.00 | 41.00 | 50.59 | 32 | 4 | High |
XR28 | 0.75 | 41.00 | 8 | 67.31 | 34.00 | 40.00 | 50.35 | 33 | 3 | High |
XR18 | 0.74 | 54.00 | 11 | 68.08 | 30.00 | 41.00 | 50.27 | 34 | 4 | High |
YJ7 | 0.75 | 41.00 | 9 | 66.73 | 32.00 | 36.20 | 49.92 | 35 | 5 | High |
YJ1 | 0.78 | 18.00 | 5 | 64.23 | 38.00 | 41.90 | 49.78 | 36 | 6 | High |
YD2 | 0.76 | 26.00 | 2 | 64.81 | 26.00 | 31.40 | 49.35 | 37 | 2 | High |
XR1 | 0.79 | 12.00 | 3 | 62.69 | 20.00 | 47.60 | 49.19 | 38 | 5 | High |
XR2 | 0.79 | 12.00 | 3 | 62.69 | 28.00 | 44.80 | 49.19 | 38 | 5 | High |
YJ11 | 0.74 | 57.00 | 13 | 66.92 | 34.00 | 39.00 | 49.16 | 41 | 7 | High |
YP8 | 0.75 | 37.00 | 3 | 65.38 | 31.00 | 44.80 | 49.16 | 40 | 3 | High |
YJ9 | 0.74 | 46.00 | 10 | 65.96 | 33.00 | 40.00 | 49.09 | 42 | 8 | High |
YJ12 | 0.74 | 52.00 | 12 | 65.96 | 30.00 | 41.00 | 48.84 | 43 | 9 | High |
YQ6 | 0.74 | 52.00 | 5 | 65.96 | 32.00 | 40.00 | 48.84 | 43 | 2 | High |
YN6 | 0.69 | 92.00 | 5 | 69.42 | 29.00 | 27.60 | 48.20 | 45 | 5 | High |
XM4 | 0.75 | 37.00 | 12 | 63.65 | 27.00 | 39.00 | 47.86 | 46 | 9 | High |
XM6 | 0.77 | 24.00 | 10 | 62.31 | 26.00 | 48.60 | 47.69 | 47 | 10 | High |
YJ13 | 0.76 | 32.00 | 7 | 62.69 | 24.00 | 32.40 | 47.38 | 48 | 10 | High |
YJ2 | 0.76 | 30.00 | 6 | 62.31 | 28.00 | 35.20 | 47.33 | 49 | 11 | High |
XR7 | 0.72 | 68.00 | 16 | 65.58 | 35.00 | 42.90 | 47.29 | 50 | 7 | High |
YQ1 | 0.74 | 50.00 | 4 | 63.65 | 34.00 | 43.80 | 47.25 | 51 | 3 | High |
YQ2 | 0.75 | 40.00 | 2 | 62.88 | 23.00 | 44.80 | 47.16 | 52 | 4 | High |
XM17 | 0.79 | 8.00 | 6 | 59.23 | 29.00 | 35.20 | 47.04 | 53 | 11 | High |
YJ6 | 0.74 | 46.00 | 10 | 63.08 | 24.00 | 35.20 | 46.94 | 54 | 12 | High |
YD3 | 0.76 | 26.00 | 2 | 61.54 | 26.00 | 43.80 | 46.86 | 55 | 3 | High |
XR5 | 0.77 | 23.00 | 5 | 60.58 | 21.00 | 31.40 | 46.48 | 56 | 8 | High |
XR27 | 0.76 | 25.00 | 6 | 60.77 | 28.00 | 43.80 | 46.39 | 57 | 9 | High |
XR4 | 0.75 | 41.00 | 8 | 61.92 | 29.00 | 41.00 | 46.32 | 58 | 10 | High |
XR8 | 0.73 | 65.00 | 15 | 63.08 | 28.00 | 41.00 | 45.85 | 59 | 11 | High |
XR23 | 0.73 | 62.00 | 13 | 61.92 | 23.00 | 36.20 | 45.25 | 60 | 12 | Moderate |
XM13 | 0.72 | 73.00 | 14 | 63.08 | 33.00 | 37.10 | 45.25 | 61 | 12 | Moderate |
YP1 | 0.75 | 34.00 | 2 | 60.00 | 24.00 | 37.10 | 45.23 | 62 | 4 | Moderate |
YQ12 | 0.75 | 44.00 | 3 | 60.58 | 25.00 | 42.90 | 45.20 | 63 | 5 | Moderate |
YD4 | 0.73 | 67.00 | 4 | 62.12 | 25.00 | 39.00 | 45.03 | 64 | 4 | Moderate |
YP3 | 0.73 | 64.00 | 5 | 61.73 | 18.00 | 40.00 | 44.99 | 65 | 5 | Moderate |
YN5 | 0.67 | 103.00 | 6 | 66.92 | 36.00 | 34.30 | 44.79 | 66 | 6 | Moderate |
YJ5 | 0.78 | 15.00 | 3 | 57.50 | 17.00 | 38.10 | 44.78 | 67 | 13 | Moderate |
XR20 | 0.74 | 50.00 | 10 | 60.19 | 25.00 | 50.50 | 44.68 | 68 | 13 | Moderate |
XM9 | 0.75 | 34.00 | 11 | 59.04 | 19.00 | 29.50 | 44.51 | 69 | 13 | Moderate |
YP5 | 0.74 | 57.00 | 4 | 60.19 | 30.00 | 34.30 | 44.22 | 70 | 6 | Moderate |
YQ10 | 0.71 | 76.00 | 6 | 61.92 | 30.00 | 41.90 | 44.06 | 71 | 6 | Moderate |
YD5 | 0.70 | 84.00 | 5 | 62.50 | 28.00 | 32.40 | 43.99 | 72 | 5 | Moderate |
XR9 | 0.70 | 87.00 | 26 | 62.50 | 34.00 | 40.00 | 43.51 | 73 | 14 | Moderate |
XR33 | 0.71 | 82.00 | 23 | 61.35 | 30.00 | 32.40 | 43.30 | 74 | 15 | Moderate |
XR15 | 0.70 | 87.00 | 26 | 61.73 | 26.00 | 35.20 | 42.97 | 75 | 16 | Moderate |
XR29 | 0.70 | 85.00 | 24 | 61.35 | 22.00 | 35.20 | 42.94 | 76 | 17 | Moderate |
XR25 | 0.76 | 26.00 | 7 | 55.96 | 20.00 | 34.30 | 42.62 | 78 | 18 | Moderate |
YQ4 | 0.71 | 82.00 | 9 | 60.38 | 26.00 | 42.90 | 42.62 | 77 | 7 | Moderate |
XR12 | 0.74 | 54.00 | 11 | 57.69 | 24.00 | 30.50 | 42.60 | 79 | 19 | Moderate |
XM8 | 0.74 | 57.00 | 13 | 57.88 | 21.00 | 36.20 | 42.52 | 80 | 14 | Moderate |
YP6 | 0.68 | 98.00 | 8 | 62.50 | 29.00 | 31.40 | 42.43 | 81 | 7 | Moderate |
XR22 | 0.72 | 73.00 | 19 | 58.27 | 24.00 | 31.40 | 41.80 | 82 | 20 | Moderate |
YQ11 | 0.71 | 76.00 | 6 | 57.88 | 24.00 | 38.10 | 41.19 | 83 | 8 | Moderate |
XR16 | 0.68 | 97.00 | 30 | 60.38 | 28.00 | 40.00 | 41.11 | 84 | 21 | Moderate |
XR10 | 0.69 | 96.00 | 29 | 59.23 | 19.00 | 35.20 | 40.89 | 85 | 22 | Moderate |
YQ5 | 0.68 | 98.00 | 11 | 60.19 | 29.00 | 38.10 | 40.86 | 86 | 9 | Moderate |
XR24 | 0.70 | 86.00 | 25 | 58.46 | 18.00 | 38.10 | 40.81 | 87 | 23 | Moderate |
YQ3 | 0.70 | 87.00 | 10 | 58.46 | 20.00 | 39.00 | 40.70 | 88 | 10 | Moderate |
XR32 | 0.69 | 94.00 | 28 | 58.46 | 18.00 | 30.50 | 40.47 | 89 | 24 | Moderate |
XM12 | 0.70 | 87.00 | 15 | 58.08 | 28.00 | 30.50 | 40.43 | 90 | 15 | Moderate |
XR26 | 0.72 | 68.00 | 16 | 55.96 | 17.00 | 31.40 | 40.36 | 91 | 25 | Moderate |
YQ7 | 0.71 | 80.00 | 8 | 56.92 | 21.00 | 36.20 | 40.28 | 92 | 11 | Moderate |
YQ14 | 0.67 | 101.00 | 12 | 59.62 | 27.00 | 35.20 | 40.01 | 93 | 12 | Moderate |
XR3 | 0.68 | 100.00 | 31 | 58.08 | 23.00 | 28.60 | 39.31 | 94 | 26 | Moderate |
YQ9 | 0.67 | 101.00 | 12 | 58.46 | 24.00 | 34.30 | 39.24 | 95 | 13 | Moderate |
YP4 | 0.70 | 87.00 | 7 | 56.35 | 14.00 | 39.00 | 39.23 | 96 | 8 | Moderate |
XR14 | 0.72 | 73.00 | 19 | 54.23 | 21.00 | 32.40 | 38.90 | 97 | 27 | Moderate |
XR21 | 0.73 | 62.00 | 13 | 52.88 | 23.00 | 35.20 | 38.65 | 98 | 28 | Moderate |
XM14 | 0.69 | 94.00 | 17 | 55.58 | 18.00 | 36.20 | 38.48 | 99 | 16 | Low |
XR11 | 0.71 | 80.00 | 22 | 54.04 | 17.00 | 31.40 | 38.24 | 100 | 29 | Low |
XR34 | 0.72 | 71.00 | 18 | 53.08 | 19.00 | 39.00 | 38.17 | 101 | 30 | Low |
XM11 | 0.69 | 92.00 | 16 | 54.62 | 19.00 | 30.50 | 37.92 | 102 | 17 | Low |
YQ8 | 0.66 | 104.00 | 14 | 54.23 | 18.00 | 41.00 | 35.98 | 103 | 14 | Low |
YD6 | 0.64 | 106.00 | 6 | 55.00 | 20.00 | 30.50 | 35.43 | 104 | 6 | Low |
XR30 | 0.71 | 76.00 | 21 | 49.62 | 16.00 | 28.60 | 35.30 | 105 | 31 | Low |
XR6 | 0.64 | 107.00 | 33 | 53.46 | 11.00 | 24.80 | 34.03 | 106 | 32 | Low |
XR17 | 0.66 | 105.00 | 32 | 50.58 | 14.00 | 37.10 | 33.36 | 107 | 33 | Low |
XR13 | 0.56 | 108.00 | 34 | 44.42 | 4.00 | 19.00 | 24.86 | 108 | 34 | Very Low |
Pearson correlation value of factors and their groups. | R | P | ||
---|---|---|---|---|
XM3 | Good communication with all stakeholders | Impact | 0.837** | 0.000 |
Probability | 0.748** | 0.000 | ||
XM7 | Clear and balanced contract terms and conditions regarding changes, claims and disputes resolution | Impact | 0.827** | 0.000 |
Probability | 0.797** | 0.000 | ||
YJ8 | Lack of awareness of site staff to notice a claim | Impact | 0.828** | 0.000 |
Probability | 0.792** | 0.000 | ||
YJ10 | The impact of the claims on project schedule not documented. | Impact | 0.840** | 0.000 |
Probability | 0.750** | 0.000 | ||
YD1 | Verbal instruction by owner has not documented. | Impact | 0.829** | 0.000 |
Probability | 0.788** | 0.000 | ||
YN1 | Disagreement arising during negotiation. | Impact | 0.829** | 0.000 |
Probability | 0.703** | 0.000 | ||
YN2 | Unsatisfactory evidence to convince other parties. | Impact | 0.805** | 0.000 |
Probability | 0.757** | 0.000 | ||
YN3 | Poor negotiation skills | Impact | 0.738** | 0.000 |
Probability | 0.816** | 0.000 | ||
YN4 | Adversarial relationship with other parties | Impact | 0.792** | 0.000 |
Probability | 0.780** | 0.000 | ||
YR1 | Statement of claims, contract and Claims quantifications are not taken into consideration | Impact | 0.685** | 0.000 |
Probability | 0.702** | 0.000 | ||
YR2 | Expert knowledge and fully documented certified claims are not taken into consideration | Impact | 0.748** | 0.000 |
Probability | 0.709** | 0.000 | ||
YR3 | Lack of negotiating skill | Impact | 0.797** | 0.000 |
Probability | 0.742** | 0.000 | ||
YR4 | Lack of specification litigation prevention techniques (independent natural). | Impact | 0.819** | 0.000 |
Probability | 0.725** | 0.000 | ||
YR6 | Lack of expert report or Claim assessment | Impact | 0.863** | 0.000 |
Probability | 0.843** | 0.000 | ||
YR7 | Balanced contracts such as FIDIC and ECC contracts are not used. | Impact | 0.800** | 0.000 |
Probability | 0.749** | 0.000 | ||
YR8 | The terms of contract don't focus on good management and effective risk distribution | Impact | 0.805** | 0.000 |
Probability | 0.761** | 0.000 | ||
YR10 | The roles and responsibilities of contracting parties are not identified. | Impact | 0.710** | 0.000 |
Probability | 0.704** | 0.000 |
Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant level |
---|---|---|---|---|---|---|---|---|---|---|
XM | Claims prevention / Mitigation | |||||||||
XM3 | 0.804 | 5 | 4 | 67.88 | 24 | 35.2 | 54.57 | 9 | 1 | very high |
XM7 | 0.808 | 3 | 2 | 64.81 | 24 | 29.5 | 52.34 | 17 | 2 | very high |
XM2 | 0.808 | 3 | 2 | 64.62 | 29 | 40 | 52.19 | 18 | 3 | High |
XM1 | 0.79 | 10 | 7 | 65.19 | 32 | 37.1 | 51.53 | 26 | 4 | High |
XM5 | 0.817 | 1 | 1 | 62.88 | 29 | 41.9 | 51.4 | 27 | 5 | High |
XM10 | 0.771 | 20 | 9 | 66.15 | 41 | 32.4 | 51.01 | 28 | 6 | High |
XM16 | 0.8 | 6 | 5 | 63.65 | 29 | 29.5 | 50.92 | 29 | 7 | High |
XM15 | 0.777 | 16 | 8 | 65.38 | 26 | 38.1 | 50.8 | 30 | 8 | High |
XM4 | 0.752 | 37 | 12 | 63.65 | 27 | 39 | 47.86 | 46 | 9 | High |
XM6 | 0.765 | 24 | 10 | 62.31 | 26 | 48.6 | 47.69 | 47 | 10 | High |
XM17 | 0.794 | 8 | 6 | 59.23 | 29 | 35.2 | 47.04 | 53 | 11 | High |
Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant level |
---|---|---|---|---|---|---|---|---|---|---|
YJ | Claims Identification and Initial Justifications | |||||||||
YJ10 | 0.777 | 16 | 4 | 70 | 36 | 33.3 | 54.38 | 10 | 1 | very high |
YJ8 | 0.756 | 32 | 7 | 70.19 | 38 | 38.1 | 53.05 | 15 | 2 | very high |
YJ3 | 0.798 | 7 | 1 | 64.62 | 29 | 37.1 | 51.57 | 25 | 3 | High |
YJ4 | 0.792 | 9 | 2 | 63.85 | 24 | 41 | 50.59 | 32 | 4 | High |
YJ7 | 0.748 | 41 | 9 | 66.73 | 32 | 36.2 | 49.92 | 35 | 5 | High |
YJ1 | 0.775 | 18 | 5 | 64.23 | 38 | 41.9 | 49.78 | 36 | 6 | High |
YJ11 | 0.735 | 57 | 13 | 66.92 | 34 | 39 | 49.16 | 41 | 7 | High |
YJ9 | 0.744 | 46 | 10 | 65.96 | 33 | 40 | 49.09 | 42 | 8 | High |
YJ12 | 0.74 | 52 | 12 | 65.96 | 30 | 41 | 48.84 | 43 | 9 | High |
YJ13 | 0.756 | 32 | 7 | 62.69 | 24 | 32.4 | 47.38 | 48 | 10 | High |
YJ2 | 0.76 | 30 | 6 | 62.31 | 28 | 35.2 | 47.33 | 49 | 11 | High |
YJ6 | 0.744 | 46 | 10 | 63.08 | 24 | 35.2 | 46.94 | 54 | 12 | High |
Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant level |
---|---|---|---|---|---|---|---|---|---|---|
YD | Claims Documentation | |||||||||
YD1 | 0.785 | 12 | 1 | 68.08 | 37 | 32.4 | 53.41 | 14 | 1 | very high |
YD2 | 0.762 | 26 | 2 | 64.81 | 26 | 31.4 | 49.35 | 37 | 2 | High |
YD3 | 0.762 | 26 | 2 | 61.54 | 26 | 43.8 | 46.86 | 55 | 3 | High |
Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant level |
---|---|---|---|---|---|---|---|---|---|---|
YQ | Claims Quantification | |||||||||
YQ13 | 0.775 | 18 | 1 | 67.12 | 33 | 29.5 | 52.01 | 20 | 1 | High |
YQ6 | 0.74 | 52 | 5 | 65.96 | 32 | 40 | 48.84 | 43 | 2 | High |
YQ1 | 0.742 | 50 | 4 | 63.65 | 34 | 43.8 | 47.25 | 51 | 3 | High |
YQ2 | 0.75 | 40 | 2 | 62.88 | 23 | 44.8 | 47.16 | 52 | 4 | High |
Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant Level |
---|---|---|---|---|---|---|---|---|---|---|
YP | Claims Presentation | |||||||||
YP2 | 0.769 | 21 | 1 | 67.50 | 36 | 42.9 | 51.92 | 22 | 1 | High |
YP7 | 0.712 | 76 | 6 | 71.15 | 36 | 34.3 | 50.63 | 31 | 2 | High |
YP8 | 0.752 | 37 | 3 | 65.38 | 31 | 44.8 | 49.16 | 40 | 3 | High |
Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant Level |
---|---|---|---|---|---|---|---|---|---|---|
YN | Claims Negotiation | |||||||||
YN3 | 0.769 | 21 | 1 | 76.92 | 46 | 43.8 | 59.17 | 1 | 1 | very high |
YN4 | 0.762 | 26 | 2 | 76.15 | 31 | 29.5 | 57.99 | 2 | 2 | very high |
YN1 | 0.754 | 34 | 3 | 75.38 | 41 | 39 | 56.83 | 4 | 3 | very high |
YN2 | 0.752 | 37 | 4 | 75.19 | 41 | 39 | 56.54 | 5 | 4 | very high |
YN6 | 0.694 | 92 | 5 | 69.42 | 29 | 27.6 | 48.2 | 45 | 5 | High |
Code | RII | RII Rank | RII Rank by Group | FI | FI Rank | FI Rank by Group | FAII | FAII Rank | FAII Rank by Group | Significant level |
---|---|---|---|---|---|---|---|---|---|---|
YR | Claims Resolution | |||||||||
YR7 | 0.76 | 30 | 1 | 75.96 | 38 | 36.2 | 57.7 | 3 | 1 | very high |
YR1 | 0.746 | 44 | 2 | 74.62 | 44 | 41.9 | 55.67 | 6 | 2 | very high |
YR3 | 0.744 | 46 | 3 | 74.42 | 43 | 41 | 55.39 | 7 | 3 | very high |
YR4 | 0.744 | 46 | 3 | 74.42 | 34 | 32.4 | 55.39 | 7 | 3 | very high |
YR6 | 0.737 | 56 | 5 | 73.65 | 42 | 40 | 54.25 | 11 | 5 | very high |
YR10 | 0.735 | 57 | 6 | 73.46 | 44 | 41.9 | 53.97 | 12 | 6 | very high |
YR2 | 0.733 | 61 | 7 | 73.27 | 29 | 27.6 | 53.68 | 13 | 7 | very high |
YR8 | 0.727 | 65 | 8 | 72.69 | 41 | 39 | 52.84 | 16 | 8 | very high |
YR5 | 0.721 | 68 | 9 | 72.12 | 34 | 32.4 | 52.01 | 21 | 9 | High |
YR9 | 0.719 | 71 | 10 | 71.92 | 42 | 40 | 51.73 | 24 | 10 | High |
Code | RII | RII Rank | RII Rank | FI | FI Rank | FI Rank | FAII | FAII Rank | No. |
---|---|---|---|---|---|---|---|---|---|
YN3 | Poor negotiation skills | 0.77 | 21.00 | 1 | 76.92 | 46.00 | 43.80 | 59.17 | 1 |
YN4 | Adversarial relationship with other parties | 0.76 | 26.00 | 2 | 76.15 | 31.00 | 29.50 | 57.99 | 2 |
YR7 | Balanced contracts such as FIDIC / ECC contracts are not used. | 0.76 | 30.00 | 1 | 75.96 | 38.00 | 36.20 | 57.70 | 3 |
YN1 | Disagreement arising during negotiation. | 0.75 | 34.00 | 3 | 75.38 | 41.00 | 39.00 | 56.83 | 4 |
YN2 | Unsatisfactory evidence to convince other parties | 0.75 | 37.00 | 4 | 75.19 | 41.00 | 39.00 | 56.54 | 5 |
YR1 | Statement of claims, claims quantifications are not considered | 0.75 | 44.00 | 2 | 74.62 | 44.00 | 41.90 | 55.67 | 6 |
YR3 | Lack of negotiating skill | 0.74 | 46.00 | 3 | 74.42 | 43.00 | 41.00 | 55.39 | 7 |
YR4 | Lack of specified litigation prevention techniques (independent) | 0.74 | 46.00 | 3 | 74.42 | 34.00 | 32.40 | 55.39 | 7 |
XM3 | Good communication with all stakeholders | 0.80 | 5.00 | 4 | 67.88 | 24.00 | 35.20 | 54.57 | 9 |
YJ10 | The impact of the claims on project schedule not documented. | 0.78 | 16.00 | 4 | 70.00 | 36.00 | 33.30 | 54.38 | 10 |
YR6 | Lack of expert report or Claim assessment | 0.74 | 56.00 | 5 | 73.65 | 42.00 | 40.00 | 54.25 | 11 |
YR10 | Roles / responsibilities of contracting parties are not identified | 0.74 | 57.00 | 6 | 73.46 | 44.00 | 41.90 | 53.97 | 12 |
YR2 | Expert knowledge and fully documented claims not considered | 0.73 | 61.00 | 7 | 73.27 | 29.00 | 27.60 | 53.68 | 13 |
YD1 | Verbal instruction by owner has not documented. | 0.79 | 12.00 | 1 | 68.08 | 37.00 | 32.40 | 53.41 | 14 |
YJ8 | Lack of awareness of site staff to notice a claim. | 0.76 | 32.00 | 7 | 70.19 | 38.00 | 38.10 | 53.05 | 15 |
YR8 | The contract has no good management / effective risk sharing | 0.73 | 65.00 | 8 | 72.69 | 41.00 | 39.00 | 52.84 | 16 |
XM7 | Clear and balanced contract terms and conditions regarding changes, claims and disputes resolution. | 0.81 | 3.00 | 2 | 64.81 | 24.00 | 29.50 | 52.34 | 17 |
Level of risk likelihood/ consequence | Fuzzy triangular number (FTN) | Defuzzied number range | Description |
---|---|---|---|
None | 0, 0, 0.1 | 0 | Risk event never happen, and no impact on the project. |
Very Low | 0, 0.1, 0.3 | 0 to < 0.20 | Minimal probability to happen, and negligible impact. |
Low | 0.1, 0.3, 0.5 | 0.20 to <0.40 | Low probability to happen, and minor impact. |
Medium | 0.3, 0.5, 0.7 | 0.40 to <0.60 | Medium probability to happen and medium impact. |
High | 0.5, 0.7, 0.9 | 0.60 to <0.80 | High probability to happen and notable impact. |
Very High | 0.7, 0.9, 1.0 | 0.80 to <1.0 | Very high probability to happen, and critical impact. |
Rank | Factor Code | Factor Name | Score |
1 | XR31 | Lack of payment certification guarantees and bonds and cash flow | 0.64249 |
2 | XR19 | Poor financial arrangement, leading to late payments | 0.63107 |
3 | XR18 | The owner changes his mind during construction | 0.62232 |
4 | XR2 | Acceptance of imprecise tender offers with lack of (clarifications, negotiations and recording of changes). | 0.61828 |
5 | XR28 | Payment delays on changing orders | 0.62436 |
6 | XR1 | Project execution time is short with lack of (site investigation, tender and contract documents). | 0.61699 |
7 | XR7 | Frequent changes and/or variations by the client. | 0.60808 |
8 | XR4 | Lack of experiences for designers, contract administrators and contractors. | 0.59453 |
9 | XR5 | Sudden swings in economic and market conditions. | 0.59501 |
10 | XR8 | Poor communications between project participants | 0.59344 |
11 | XR20 | Owner's reluctance to each decision that might be criticized | 0.57468 |
12 | XR27 | Design errors, omissions and contradictions in documents | 0.57878 |
13 | XR23 | Lack of procedure to correct errors between owner, designer and contractor | 0.56856 |
14 | XR33 | Constructive acceleration | 0.57357 |
15 | XR9 | Procurement problems | 0.57504 |
16 | XR29 | Price determination on change order. | 0.56525 |
17 | XR15 | Separate contracts (coordination problems). | 0.56477 |
18 | XR12 | Suspensions issues | 0.55816 |
19 | XR10 | Unbalanced risk allocation. | 0.54852 |
20 | XR25 | Contractor inability for site supervision and management | 0.54657 |
21 | XR24 | Conflict management | 0.53972 |
22 | XR16 | Untimely approvals. | 0.53936 |
23 | XR26 | Engineer's satisfaction clauses | 0.52872 |
24 | XR32 | Unclear employer applications and responsibilities of all the other parties | 0.53568 |
25 | XR22 | Misinterpretation of construction documents | 0.54167 |
26 | XR3 | Changes arising from local authority sources. | 0.53339 |
27 | XR14 | Indecisive management. | 0.52294 |
28 | XR11 | Unrealistic planning and specifications | 0.51864 |
29 | XR34 | Non-compliance with professional ethics in construction | 0.51695 |
30 | XR21 | Using unstudied design and elements for the first time | 0.51286 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |