Preprint
Article

A Holistic Approach in Re-Mining Old Tailings Deposits for The Supply of Critical Metals: A Portuguese Case

Altmetrics

Downloads

294

Views

364

Comments

0

A peer-reviewed article of this preprint also exists.

Submitted:

31 July 2019

Posted:

01 August 2019

You are already at the latest version

Alerts
Abstract
The growth of demand for metallic minerals has faced with the need for new techniques and improving technologies for all mine life cycle operations. Nowadays, the exploitation of old tailings and mine wastes facilities could represent a solution to this demand, with economic and environmental advantages. W-Sn Panasqueira Mine has been operating for more than 100 years. Its first processing plant “Rio” was located near Zêrere river being the mineral processing residues deposited on the top hillside on the margin of this river in Cabeço do Pião tailings dam. The lack of maintenance and monitoring of this enormous structure in the last twenty years represents high risks to the environment and population of the surrounding region. The re-mining of the tailings by hydrometallurgical methods was considered, in order to satisfy these two enounced conditions - metals demand and environmental risk, aiming for the sale of the metal to pay the environmental intervention. Field samples campaign allowed collecting data and results from laboratory tests driving to use regression optimization. The re-mining solution was studied, taking into account the technical, economic, social, and environmental aspects.
Keywords: 
Subject: Engineering  -   Industrial and Manufacturing Engineering
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.
Prerpints.org logo

Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.

Subscribe

© 2024 MDPI (Basel, Switzerland) unless otherwise stated