Preprint
Article

C-S & S-C Monitoring of Time and Cost Variances of Schedule Using Complex Earned Value Method Indicators

Altmetrics

Downloads

330

Views

289

Comments

0

This version is not peer-reviewed

Submitted:

14 November 2019

Posted:

16 November 2019

You are already at the latest version

Alerts
Abstract
Planning and implementation of construction projects are difficult processes and are burdened with many risk elements. The budget spread over time, which is developed on the basis of the schedule, presents the expected distribution of costs throughout the duration of the works, which during the implementation of the project is subject to constant changes resulting from time, cost and organizational factors. Managing construction contracts requires managers to be able to analyze on an ongoing basis the variances of production costs - from the values calculated in the offer cost estimate and assumed in the Budgeted Cost of Work Scheduled. The article attempts to analyze the emerging time and cost variances using proprietary C-S and S-C monitoring, based on simple indicators of the EVM method. An example of construction of a multi-family housing development was used to study the variances of planned and incurred costs.
Keywords: 
Subject: Engineering  -   Civil Engineering
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.
Prerpints.org logo

Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.

Subscribe

© 2024 MDPI (Basel, Switzerland) unless otherwise stated