A Perception Survey of Lean Management Practices for Safer Off-Site Construction

Altmetrics

Downloads

55

Views

20

Comments

0

A peer-reviewed article of this preprint also exists.

This version is not peer-reviewed

Submitted:

20 August 2024

Posted:

28 August 2024

You are already at the latest version

Alerts
Abstract
Lean practice is recognised for having a great potential in promoting safety risk management in offsite construction (OSC). This paper presents results of a study conducted to assess the impact of lean practice in safety risk management in OSC in a developing country. A quantitative approach using survey-based questionnaire was adopted. Lean management practices (LMPs) identified from literature review were empirically tested using a sample survey of 103 OSC contractors. The survey responses were subjected to descriptive and inferential statistics. The top ranked LMPs for safety risk management in OSC included two mistake proofing practices, i.e., use of personal protective equipment (PPE) and use of hazard warning equipment; two last planner system (LPS) practices, i.e., involvement of workers in safety planning and providing necessary working equipment and one first run studies (FRS) practice, i.e., critical analysis of work methods. These LMPs are useful in controlling high consequence safety risks in OSC. Based on evidence found in this study, the paper argues that lean practice can bring great value in the safety risk management in OSC in countries where OSC is transitioning.
Keywords: 
Subject: Engineering  -   Architecture, Building and Construction

1. Introduction

Off-site construction (OSC) refers to a process where modules are manufactured and partly assembled in a specialised off-site factory, then transported and assembled on-site into a complete building structure [1,2]. The term OSC is espoused in international literature under various terminologies such as modularised, prefabricated, standardised, volumetric [3], modular integrated construction (MiC) [4] and design for manufacture and assembly (DfMA) ([5]. The terminologies are used inter-changeably in extant literature to describe prefabricated construction [2,6].
OSC gained momentum as a result of its sustainability benefits. Compared to traditional construction, OSC is believed to promote robust safety risk management, causing its acceptability and wider adoption in the recent years [7]. Across the spectrum of off-site production systems, the products of modular building (MB) are the most complete components made in-factory that are delivered partially or fully finished, with minimal finishing and installation operations performed on site [2,8]. Actually, MB products are engineered and manufactured to 95% completeness in an off-site workshop [9]. Higher degree of off-site prefabrication and assembly entail significant safety benefits. Transferring of hazardous and risky on-site building operations from site to factory forestalls the occurrences of accidents. By its nature, MB entails a higher degree of prefabrication with minimal finishing work performed on site and the number of on-site workers is significantly reduced. The proportion of off-site to on-site workers for OSC operations in MB oscillates between 30% and 70%, respectively [10]. Obviation of the need for a large on-site workforce in the equation of the construction process is a major safety benefit of the MB production system., especially due to the fact that human behaviours are in the vogue of accident causality in the construction industry.
However, OSC processes present unique safety risks that are a cause of concern [11,12]. OSC operations involve material imports and loading, cutting, welding, lifting, unit assembly, interior and exterior finishing, and packing, i.e., in the manufacturing phase, and unit transport, site preparation, unit lifting/hoisting, unit/s assembly and installation, screwing, roof, interior and exterior finishing, i.e., in the construction phase [13,14]. The nature of these operations increases’ workers safety risks. Most of the OSC operations involve working at high altitude or under heavy load to assemble and install modules [3]. Use of elevated work platforms (EWPs) such as ladders and mobile scaffolding and cranes were cited as causes of accidents in OSC [13]. During manufacture of modular units, workers are required to produce units of varying sizes due to uniqueness of each project. This complicates the work processes and increases frequency of irregular work positions, manual work and extra steps [13]. Due to its meticulous operations, OSC processes require well trained workers which are available in limited numbers [13]. Use of untrained workers results into improper operations which expose workers to safety hazards [13 Oftentimes, accidents are also caused by conflicts between personnel activities and machinery during construction process. Falling and struck-by are the commonest types of accidents experienced in OSC [3]. They are believed to be caused by complex production and construction processes of OSC, lack of experience, competencies and conflicts between machinery mobility and personnel activities [13].
Lean practice is recognised for having a great potential in promoting safety risk management in OSC. Lean practice is characterised as a set of management practices for eliminating wastes and non-value adding activities in the production process. It is aimed at minimising construction wastes, such as accidents, to achieve efficiency in OSC [15]. The philosophy is argued to eliminate most of the causative agents of accidents in the construction industry [15,16,17,18]. LC is an approach that advocates for identification of operational conflicts or root causes of waste/accidents, removing the waste/accidents using related LC tools and practices, and promoting prevention of waste/accidents and its negative effects. While lean management tools (LMTs) are higher-level methodologies adopted to realise reliable construction activities, LMPs are specific qualitative practices that define a how certain activities should be executed safely.
The safety impact of LMPs has been documented in literature. Han et al. [19] highlighted the use of visualisation tools to abate accidents caused by cranage operations. Li et al. [20] approved the use of visualisation tools to plan arrangements of construction assets on site to improve workplace design. The motion-based applications were recommended for identification of unsafe human behaviours to proactively prevent occurrence of accidents [20]. Safety training and communication were recommended for safety management in construction processes [21]. Liu et al. [22] emphasised on the importance of safety meetings and involvement of workers in training and communication events in improving safety climate. Goh et al. [23] proposed a simulation-based training which allow workers to experience the real-life activity in augmented reality. Worker’s safety skills and knowledge imparted through organised safety trainings are an important element for maintaining higher safety standards in OSC [24,25]). For this reason, training programmes designed to impart knowledge based on the needs of the workers is considered pivotal for creating a safe workplace environment. Continuous safety training and education can enrich workers safety behaviour and eliminate unsafe human behaviours caused by inappropriate working procedures and mistakes [20,22]. Furthermore, lean techniques are used in the planning and management of OSC workplace design to improve safety [24,26,27]. Employee task allocation [28], planning and proper management of OSC tasks [29] were recommended as measures for safety improvement in OSC. Formulation of safety plan based on anticipated safety risks was promoted as a technique for fulfilling OSC tasks safely [30]. Mao et al. [31] suggested creation of a workplace environment that supports safer movement of people and machineries. This is critical in OSC where most of the operations are executed by machines. Additionally, OSC involve multiple stakeholders with varying and sometimes conflicting responsibilities working at different locations to design, manufacture, transport and install the components [24]. Extensive collaboration among stakeholders and workers can improve coordination and communication in determining and overcoming safety issues in OSC [24]. The foregoing discussion shows that a plausible link exists between lean practice and safety risk management in OSC.
This paper presents results of a study conducted to assess the impact of lean practice in safety risk management in OSC. The paper departs from prior studies which characterize construction as the most hazardous industry and lean practice as a philosophy for addressing safety issues in construction. Additionally, the compelling vantage point from which to examine the connections between lean practice and safety risk management in OSC is from the perspective of the urgent need for OSC as an alternative construction method to the hazardous conventional stick-built construction method. The shift to OSC provides a platform for deriving optimal lean manufacturing and construction interventions for OSC projects. This apparent potential relationship is significant to imbue an exploration of lean practice optimal contribution to safety in OSC. This could in turn demonstrate its full breadth of potential to safety in OSC processes and increase its global employment. Besides, an increasing number of scholars have begun exploring the safety considerations in OSC projects using modern advanced construction technologies. Chattzimmichailidou and Ma [3] reviewed how BIM could be used in safety risk management of modular construction. Banks et al. [32] and Chen et al. [33] examined the safety benefits of DfMA in OSC. This trajectory makes safety risk management a key area of research in OSC and application of lean for safety improvement in OSC an urgent mission. Besides, in countries where advanced construction technologies such as BIM have not been assimilated, mature production systems such as lean practice become essential to establish reliable manufacturing and construction activities to minimize process and production wastes.
Additionally, very little research exist that provides generic overview of how various LMPs control safety hazards in OSC. Soltaninejad et al. [34] explored the safety climate improvement of construction workplace using 5S + safety system. James et al. [26] and Nahmens and Ikuma [35] focused on the safety impact of Kaizen in modular home manufacturing. Bashir et al. [35] reviewed the safety impact of three lean principles of last lanner system (LPS) 5S housekeeping and poka yoke while Bajjou et al. [15] explored the potential safety effectiveness of LPS, visualization management, 5S housekeeping and poka yoke. Thus, studies that offer a thorough analysis of the impact of lean practice in safety risk management in OSC are limited. Similar studies in the context of countries where OSC is transitioning are practically non-existent. The dearth of literature on this topical issue could lead to pseudo implementation of LMPs with consequential negative impact on the overall safety risk management in OSC. Consequently, this paper investigates the impact of various lean practices safety risk management in OSC. Based on results presented in this paper, lean practice can bring great value in the safety management of OSC. Integrating lean concepts in safety risk management in OSC will result in a more comprehensive conclusion on ways to enhance safety in OSC. LMPs could be taken as a first intervention for proactively preventing high consequence safety risks where adoption of OSC is still in the transition phase. Th findings contribute to the body of knowledge in lean practice and safety risk management in OSC.

2. Materials and Methods

The study adopted a quantitative research design within the confines of positivism epistemology where statistical analysis formed the basis for evaluating the impact of LMPs in safety risk management in OSC. The study implemented a multi-stage methodological framework comprising prior literature, survey design and administration, sampling, pre-testing of dataset and data analysis. A similar methodological approach is widely used in construction engineering and management (CEM) research i.e., [1,36,37,38].

2.1 Prior Literature

An intensive review of literature was undertaken to identify LMPs that control safety hazards in OSC. In developing items to be included in the survey, consideration of whether to develop new scale items around LMPs (option 1) or use existing ones (option 2) as available in the literature was made. The study relied on option 2 for two reasons. First, due to time limitations, it was impossible to develop new constructs. As observed by the seminal work of Prajogo and Sohal [39], the development of new constructs is a complex task. Second, as argued by Ta et al. [40], use of pre tested survey constructs from previous empirical studies ensures their validity and reliability. Consequently, available relevant literature on lean tools and practices was reviewed. There are several lean tools and practices being applied in the construction industry [41]. However, only those that were considered relevant in safety risk management in OSC were considered. This was based on the empirical evidence in the reviewed literature. A similar approach is common in CEM research, i.e., Chileshe et al. [36], Hwang et al. [42] and Ameyaw [43]. Some of the selected studies with relevant lean tools and practices for safety risk management in OSC include [15,41,44,45,46,47,48]. Consequently, a total of 6 LMTs comprising 30 LMPs were identified as having impact on safety in OSC. These included daily huddle meetings (DHM) comprising 5 LMPs, first run studies (FRS) with 2 LMPs, mistake proofing (i.e., 6 LMPs), 5S housekeeping (i.e., 4 LMPs), improved visualisation (i.e., 5 LMPs) and LPS (i.e., 8 LMPs) (See Table 1). The LMPs formed the basis for designing the survey instrument to collect respondents’ perception on how the LMPs control safety hazards in OSC. A methodological approach that uses comprehensive literature review for identification of variables for questionnaire design is common in lean practice research, i.e., [49,50].

2.2. Survey Design and Administration

A questionnaire is an instrument used most frequently for data collection in quantitative studies. It contains standardised and comparable questions [52] to which participants provide responses. The choice of questionnaire for solicitation of data in this study was mainly influenced by two reasons. First, the study draws on the cumulative experiences and knowledge of OSC contractors regarding LMPs [1]. Questionnaires are more appropriate for measuring lived experiences [53]. Second, the statistical analysis of the data required quantitative data that was consistent and specific. Such data could only be collected through a questionnaire. The questionnaire design focused on answering specific research questions and had two sections. Section 1 comprised relevant respondents’ and company characteristics including respondents’ role, experience and size of organization. Section 2 was designed to solicit respondents’ views on what LMPs control safety hazards in OSC. The survey instrument contained 30 LMPs under five categories, i.e., DHM, FRS, mistake proofing, 5S housekeeping, improved visualization and LPS. The respondents were asked to rate the likelihood with which LMPs could control safety hazards in OSC. A 5-point rating scale was used where 1 = extremely unlikely, 2 = unlikely, 3 = neutral, 4 = likely and 5 = extremely likely. A 5-point rating scale was chosen for various reasons. First, it generates unbiased data that is valid and reliable. Second, it maximizes communication within its rating scale gradations, thereby allowing respondents to concisely convey their thoughts [54]. Third, it captures data in a quantitative manner for robust statistical analysis [55] and has remained a preferred data collection tool in CEM discourse ([44,46]. It has been used in investigating management and implementation issues in OSC [42], occupational health and safety (OHS) and lean practice [44]. The survey was administered using two respondents’ preferred methods, including a completion of an online “Survey Monkey” and physical administration of the questionnaire at the respondents’ offices. Data was collected in Malawi between May and August 2023.

2.3. Sampling

The study targeted technical management personnel working with OSC contractors. Due to unavailability of a central database for OSC contractors, purposive sampling was used to select the respondents. The list of potential OSC contractors was downloaded from the national construction industry council (NCIC) website, and initial telephone inquiries were made to ascertain the companies’ involvement in OSC. Since OSC is still in its infancy in Malawi, the potential respondents were asked to state if they have ever been involved in projects where two or three-dimensional building components such as beams, columns, shower rooms, toilet pods etcetera, or modular construction was used. This approach was augmented by site visits to ascertain the potential respondent’s organization involvement in OSC. The study targeted a medium sample size for a purposive sampling of 100-999 respondents [56]. After a considerable period of searching and tracing, a total of 360 contractors were identified and invited to complete the questionnaire.

2.4. Data Analysis Procedures

The collected data was analyzed using IBM Statistical Package for the Social Sciences (IBM SPSS v.26). The internal consistency of the survey instrument containing 30 LMPs was measured using Cronbach’s alpha statistic. It is popular reliability statistic which determines the average correlation of items in a survey instrument [57]. The Cronbach’s alpha reliability coefficient values range from 0 to 1, with 0.7 ≤ α < 0.9 deemed within acceptable range [58].
Shapiro Wilk test was conducted to examine the normality of the dataset. This comes on the backdrop of many statistical tests assuming normally distribution in the dataset thereby employing parametric testing [59]. Shapiro Wilk test is the most popular omnibus test for normality distribution and has been employed in many previous CEM research studies, i.e., Hwang et al. [42] and Wuni and Shen [1]. Furthermore, Kruskal –Wallis test was conducted to determine whether there were statistically significant differences in the responses of the raters in the rating the safety impact of LMPs in OSC. The Kruskal-Walli’s test is widely used to conduct inter-group comparison for checking significant differences among respondents ([42,60]. The approach forms the basis for treating collected data as a unified whole for analysis [1].
Descriptive statistical methods of mean score (MS) and standard deviation (SD) were used as a basis for ranking LMPs. The MS formed the basis for ranking the techniques, while the SD was used to rank techniques with the same MS values. Techniques with lower SD were ranked higher than techniques with higher SD. MS analysis is widely adopted statistical tool in CEM studies for determining the impact of a set of constructs [37). Furthermore, the statistical MS values for LMPs were used to calculate overall average MS value for ranking the relative impact of LMTs. The traditional cut-off point for a rating scale depends on the fuzzy linguistic variables assigned to each number on the scale [1]. The 5-point Likert scale used in this study implied that the values 4.0 and 5.0 represent likely and extremely likely, respectively. Thus, the value 4.0 is seen here as the level at which LMP is useful in safety risk management in OSC. As such, 4.0 was considered the minimum threshold average MS value for determining safety impact of LMPs and associated LMTs. Though other studies, i.e., Wuni and Shen [1] and Mao et al. [31] have used 3.5 as a minimum threshold on a 5-point Likert scale, 3.5 was considered closer to neutral.

3. Results

3.1. Survey Response

Out of 360 questionnaires distributed, a total of 103 valid responses were returned. This is considered adequate considering that it exceeds the 30 minimum valid responses required for central limit theorem to make valid conclusions [55]. Furthermore, a response rate of 28.6% size compares favourably against construction safety studies targeting similar geospatial respondents, i.e., 15.7% [61] and 28% [62]. Regardless, the relatively smaller response rate necessitates cautious application of the study results.

3.2. Respondents Profile

The results of respondents’ profile are given in Table 2. The results of the professional roles show that more than half of the respondents (51.9%) were either project managers (26.4%) or quantity surveyors (25.5%). Most of the respondents had over 15 years of general experience in construction with 31.8% having over 11 years of experience in OSC. Regarding company size, most of the respondents’ companies were medium-sized organizations (42.7%). The majority of the companies, i.e., 65%, undertake both building and civil engineering works. Taken together, the respondents’ profile could depict a true reflection of their perception regarding safety impact of LMPs in OSC.

3.3. Pre-Testing Survey Response

The Cronbach’s alpha reliability coefficient value of 0.833 was obtained which is higher than the standard value of 0.7 espoused by Nunnally [62]. It is also within the acceptable range of 0.7 ≤ α < 0.9 proposed by Surucu and Maslacki [58]. This indicates that the responses had internal consistency, and as such, the 5-point scale measurement instrument used for data collection was significantly reliable. The assessment of normality using Shapiro Wilk Test shows that there was a statistically significant difference between collected data and normal distribution (See Table 3). The observed p value of 0.01 was less than the common alpha value of 0.05 thereby confirming that the data was not normally distributed at 95% confidence level. This implied that only non-parametric statistical methods could be used for data analysis. The results of a rank-based non-parametric test; Kruskal -Wallis test undertaken at a significance level of 5% are shown in Table 3. The observed p values are greater than alpha value of 0.05. Thus, the responses of the respondents were unanimous to the effect that none of the LMPs were perceived statistically different by various respondents which rendered the data credible for further analysis.

3.4. Mean Score Analayis and Ranking of LMPs

Table 3 provides results of the perception of the respondents on the impact of lean practice in safety risk management in OSC. The five top most ranked LMPs with high likelihood of controlling safety hazards in OSC include LMP1, i.e., use of PPE with MS 4.41 and SD 0.619; LMP2. i.e., involvement of workers in safety planning with MS 4.35 and SD 0.652; LMP3, i.e., providing necessary working equipment with MS 4.30 and SD 0.639; LMP4, i.e., use of hazard warning equipment with MS 4.30 and SD 0.725; and LMP5, i.e., critical analysis of work methods with MS 4.28 and SD 0.569. As pointed out, SD was used to measure how far the overall rating of LMPs deviated from the associated MS. It was also used to rank LMPs with the same MS, in which LMPs with lower SD were ranked higher, i.e., LMP3 & LMP 4; LMP5, LMP6 & LMP7; LMP8, LMP9, etcetera. The SD also helped to measure the consensus in the ratings of the respondents of the safety impact of LMPs in OSC. Though there are no minimum and maximum threshold for SD, smaller values suggest higher consensus among the respondents. As can be seen from Table 3, all LMPs had SD less than 1.0, indicating higher consensus in the rating of LMPs among the respondents. The least ranked LMPs include LMP26, i.e., use of visual tools with MS 4.19 and SD 0.728; LMP27, i.e., use of safety signs and labels with MS 4.18 and SD 0.751; LMP28, i.e., schedule site activities and simultaneous supervision plan with MS 4.17 and SD 0.596; LMP29, i.e., empower and involve safety workers in schedule planning with MS 4.17; and SD 0.663; and LMP30, i.e., undertake pre-task hazard analysis with MS 4.14 and SD 0.715. Though the ranking of the LMPs indicate different levels of their safety impact, they all exceeded the minimum threshold of 4.0, signifying that they were perceived likely to control safety hazards in OSC.

3.5. Average Mean Score for LMTs

LMTs were ranked based on average MS values calculated from individual MS values of LMPs within a particular LMT. As shown in Table 4, mistake proofing had a highest average MS of 4.33 and SD of 0.682. Second ranked LMT was FRS with average MS of 4.27 and SD of 0.620. The third ranked LMT was DHM with average MS of 4.23 and SD of 0.623 while fourth ranked was 5S housekeeping with average MS and SD of 4.23 and 0.657, respectively. LPS was ranked fifth with average MS of 4.22 and SD of 0.651 while improved visualisation was least ranked with average MS and SD of 4.22 and 0.655, respectively.

5. Discussion

Results of the MS analysis shows that all 30 LMPs are useful in safety risk management in OSC, having scored an MS exceeding 4.0 on the 5-point rating scale. Additionally, the minimal differences in the MS values among the LMPs suggest that respondents unanimously evaluated the LMPs as almost equally likely, i.e., significant, in safety risk management in OSC. However, construction companies would usually prioritize selection and implementation of LMPs that focus on aiding elements of practicality and efficiency to the construction processes [64], as well as those that provide immediate initial successes, i.e., in terms of safety, beside those that improve project success factors such as time, cost and productivity [65]. Furthermore, construction companies would prioritize LMPs in which they have organizational expertise and those which have spillover benefits [65]. It is understood that only LMPs that are affordable, compatible and efficient contribute significantly to the overall outcome of the project [65]. This could be the basis for results of the ranking of LMPs shown in Table 3. Thus, for example, LMP1, i.e., use of PPE is deemed efficient and affordable; a significant factor in project success; an LMP which can easily be implemented; and thus, effective in safety risk management in OSC. Unlike top ranked LMPs such as LMP1, low ranked LMPs such as LMP30 could be is viewed as lacking in helping orgaisations to realise immediate initial gains in safety. They could also be difficult to actualize due in part to lack of organizational expertise to implement them. The following section discusses the perceived impact of LMPs in safety risk management in OSC in chronological order of their significance. Accordingly, LMPs are discussed under their respective LMTs.

5.1. Lean Management Practices for Safer Offsite Construction

5.1.1. Mistake Proofing

The first overall ranked LMT was mistake proofing with average MS and SD values of 4.33 and 0.682, respectively. Mistaking proofing involves implementation of LMPs that prevent free flow of inadvertent errors in the construction process. It is widely useful in prevention of accidents caused by human errors and equipment failure [15,66]. In view of this finding, human errors and equipment failure could be seen as prevalent safety hazards in countries where OSC in transitioning. Even in countries where OSC is in maturity stage, the aforementioned safety hazards were reported to be among the frontline accident causal factors [13]. The emergent implication from the above finding is that, for any OSC project, in order to effectively minimise safety hazards caused by human errors and equipment failure, contracting organisations should consider implementing mistake proofing LMPs. It was therefore not surprising to note that mistake proofing related LMPs were ranked higher as more likely to control safety hazards in OSC. Such practices included LMP1, i.e., use of PPE, LMP4, i.e., use of hazard warning systems, LMP7, i.e., use of safeguards and LMP8, i.e., visual inspections.
The use PPEs was the overall top ranked LMP with MS = 4.41, implying that it is perceived likely to control safety hazards in OSC. PPEs are a form of body insulation consisting of hard hats, overall or work suits, gloves, boots or gumboots, googles, as well as masks. PPEs protect the workers from a wide variety of hazards including burns, laceration potential from impaling and striking objects, struck against objects, struck-by moving equipment or flying objects, trip and slip hazards and falling hazards, [67]. Serendipitously, falling and struck-by are the top causes of accidents in OSC [25]. In OSC operations, workers face consistent threat of falling from EWPs and struck-by accidents posed by onsite equipment and falling objects. PPEs protect workers from being directly struck-by or hit against machines or objects. Similarly, hazard warning systems predict workers and equipment real-time movements and exact positions on construction sites [68] for avoidance of collision accidents [69]. Generally, construction equipment and machine-related accidents such as crane failure and collapse, use of faulty equipment and tools, collision of machines and failure to safely use machines could be avoided through hazard warning and equipment alert systems. Use of PPEs and hazard warning systems should therefore be promoted in OSC to control common causes of accidents, i.e., human mistakes and struck-by.

5.1.2. First Run Studies

The second overall ranked LMT was FRS with average MS and SD scores of 4.27 and 0.627, respectively. FRS is a systematic method for critically analysing work methods to identify the most appropriate and safest method that matches the ability and skills of the workers [44]. It is employed to minimize accidents caused by lack of training, knowledge and improper operations by operators (14,20]. In countries where OSC is transitioning, safety training and induction in OSC operations is paramount. OSC operations require skilled and experienced workers to execute complex operations. However, due to limited projects, there are only a few skilled and experienced contractors, experts and workers in OSC globally [3]. As such the construction industry relies on in-training workers, who are required to master multiple skills and quickly adapt to new working procedures. FRS offers an opportunity to review work methods and select appropriate methods that correlate with workers abilities, skills and experience. LMP5, i.e., critical analysis of work methods was ranked 5th as more likely to control safety hazards in OSC. LMP10, i.e., illustration of work methods through videos and photos demonstrates how tasks could be performed safely by the novice, and was ranked 10th. The emergent implication of the above finding is that, for countries where OSC is transitioning and the number of skilled and experienced workers in OSC operations is limited, implementation of FRS practices is critical to prevention of safety hazards emanating from lack of training, knowledge and experience.

5.1.3. Daily Huddle Meetings

The third overall ranked LMT was DHM with average MS and SD of 4.23 and 0.623, respectively. It provides a platform for brief daily start-up meetings of project stakeholders to review previous work, discuss good and bad aspects and suggest ways of improving performance [48,51]. It is mainly used to minimize accidents caused by poor communication [16], stressful work [70] and ergonomic hazards [35]. Good communication among project stakeholders is key to safety in OSC, regardless of the industry’s’ OSC maturity level. The results revealed that two-way communication was the highly ranked LMP among DHM practices with MS = 4.28, SD = 0.569, followed by hazard identification and elimination (MS = 4.23, SD = 0.715 and sharing of information (MS = 4.22, SD = 0.576). According to Ghosh [16] two-way communication improves coordination between employers and employees, raises morale among workers and increases job satisfaction as workers feel to be an important part of the harmonious construction team. This may lead to employee agility in relation to handling of safety issues, where employees develop capabilities to appropriately respond to any safety issues as a result of proactivity, adaptability and resilience [71]. DHM allows workers to deal with challenges with speed, flexibility and decisiveness [72] which is vital in the dynamic OSC processes. Furthermore, two-way communication and sharing of information create a supportive environment in which safety issues are handled with a unified front due to the fluid interaction and employee networking fostered by DHM. In consonance with findings of Ghosh [16], Noorzai [64], James et al. [26, Li et al. [20], Sarhan et al. [47], Hwang et al. [42] and Bashir [51], DHM related techniques promote safety awareness, communication and coordination which improves workforce safety behaviour. The emerging results foster the need for adoption of lean tools that promote open communication and sharing of information among a turnover of in-service training workers, with the aim of improving safety awareness and develop capability to respond to safety issues intuitively.
5.1.4. 5S Housekeeping
5S housekeeping was the fourth overall ranked LMT with average MS and SD of 4.23 and 0.651, respectively. 5S housekeeping is a site planning management tool [45], aimed at optimizing the arrangement and formation of various offsite/onsite factors to improve efficiency and eliminate wastes [46]. This lean tool addresses safety hazards related to unsafe site conditions, [46], site congestion [73], and extra steps and confusion [74]. OSC operations demand extensive use of machines such as overhead cranes, loaders and forklifts, with workers being required to work in close proximity with such heavy equipment [25]. This renders thorough analysis on the handling of heavy equipment and the use of cranes important in order to identify safety risks and optimize site layout planning, to minimize safety hazards. 5S housekeeping related practices including organizing, improved circulation around the workplace and cleanliness/orderliness were ranked 11th (MS = 4.25; SD = 0.532), 14th (MS = 4.23; SD = 0.689 and 15th (SD = 4.23; SD = 0.703), respectively. These lean practices ensure that construction assets including materials, tools and plant are placed in regular, illuminated and accessible locations and that the site has clear marked routes and adequate working operating space to improve circulation [75,76]. By providing a conducive workplace, 5S provides a platform for the effective implementation of all other LMTs [70]. In OSC operations where machine and people work in close proximity, optimal site layout becomes a critical site management factor in safety risk management.

5.1.5. Last Planner System

The fifth ranked LMT was LPS with average MS and SD of 4.22 and 0.651, respectively. LPS minimizes waste and improves reliability in production flow through robust planning, control, scheduling and mutual coordination among project stakeholders [15]. Two of the LPS practices were ranked 2nd and 3th as more likely to control safety hazards in OSC. These included involvement of workers in safety planning (MS = 4.35; SD = 0.652) and providing necessary working equipment (MS = 4.30; SD = 0.639). Prominence of LMP2 and LMP3 in safety risk management has been demonstrated in previous studies. According to Camuffo et al. [77], workers involvement in safety planning reduces accidents related to poor work methods, and physical and mental limitations. It also minimises accidents resulting from poor planning and control, as well as unsafe acts of workers [78]. Ghosh [16] affirms that workers involvement in safety planning promotes behavioural tenets critical to safety including workers commitment, enhanced self-esteem, sense of belonging and cohesiveness. Similarly, provision of necessary working equipment is critical for safety and was ranked fifth as the most commonly implemented practice in a study by Enshassi a et al. [44]. Though other LPS practices had low rank, their safety impact cannot be ignored. Pre-task hazard analysis is used to identify and reduce safety risks [51]; selecting and correlating workers abilities with work methods reduce accidents caused by poor work methods [78]; and allocating work to individuals with suitable abilities could reduce accidents related to lack of skills and experience. Overall, involvement of workers in safety planning and provision of appropriate working equipment are critical in safety risk management in OSC.

5.1.5. Improved Visualization

The least ranked LMT was improved visualization with average MS and SD of 4.22 and 0.655, respectively. Use of improved visualization on construction sites eliminates safety hazards caused by poor site awareness, poor communication and extensive use of equipment [35,48,51]. Elimination of such safety hazards is crucial in OSC operations where extensive use of machinery requires good site awareness and proper communication among site workers. Though improved visualization techniques were ranked low, i.e., 9th, 12th, 17th, 25th and 27th, they are relevant in safety risk management in OSC. Enshassi and Saleh [44] and Bajjou et al. [15] found that positioning safety signs at different locations on construction site improves safety awareness and reduce human errors. Safety signs can prevent entry into unauthorized and dangerous areas by workers or members of the public. They can also abate effects of human mistakes through work standardization which improves work proficiency. Visual tools such as signs and labels provide information that is self-explanatory and easy to interpret by workers. The information can be provided in real-time thereby providing the much-needed proactivity and flexibility in dealing with safety issues. Visualization tools are also crucial for safety in machine-related operations ([19].

5. Theoretical and Practical Implications of the Study

[79] acknowledged that empirical research provides theoretical and practical knowledge which provides a bedrock for future research and industrial practice. The current study identified LMPs for safety risk management in OSC in the context of countries where OSC is in early stages. Overall, the study makes a unique contribution to the lean practice body of knowledge through identification of LMPs for safety risk management in OSC. From a theoretical lens, the study constitutes generic research findings on lean practice for safety risk management in OSC, drawing on perspectives from sub-Saharan region. The study provides a rank of LMPs that are considered significant for safety risk management in OSC. Thus, the study provides the basis for future research on LMPs for safety risk management in OSC in countries where OSC is still in its initial stages. This could be regarded relevant to academic researchers in lean practice, safety and OSC.
In the context of practice and management, the ranked LMPs will serve as a guide for implementation of lean practice for safety improvement in OSC. Implementation of top ranked LMPs may help control safety hazards in OSC. Regardless, since all LMPs were rated significant, lean improvement efforts need to be directed at helping companies understand the importance of low ranked LMPs for comprehensive safety performance. Further, since the study was conducted in a country with specific socio-economic characteristics, country specific studies may be conducted for identification of prioritised LMPs. The top ranked LMPs in this study may be associated with contextual issues which may be different in other countries.

6. Conclusions, Contributions and Limitation of the Study

Lean practice leverages significant safety risk management in OSC. Lean practice is considered a mechanism for reducing wastes in the construction industry. Construction accidents are an example of wastes and implementation of LMPs contribute to reduction of accidents. However, studies conducted to identify LMPs for safety risk management in OSC in the context of where OSC is new are limited. The study assessed the impact of 30 LMPs for safety risk management in OSC. A structured questionnaire survey was used to collect quantitative data for statistical analysis on 5-point rating scale. The LMPs with most significant impact on safety in OSC projects based on MS analysis included 2 mistake proofing practices, i.e., use of PPE and use of hazard warning equipment, 2 LPS practices, i.e., involvement of workers in safety planning and providing necessary working equipment and 1 FRS practice, i.e., critical analysis of work methods. The respondents unanimously rated all LMPs as having significant impact on safety in OSC with MS exceeding 4.0. The inclusive findings of the study highlight the significant role of lean practice in promoting safety in OSC and has useful implications. The study has ranked LMPs critical for safety risk management in OSC in the context of countries where OSC is in developing stages. Thus, the study provides a generic checklist of LMPs for implementation in OSC to improve project safety success rate. The results of the study are applicable where OSC is in early stages though bespoke studies are recommended. The current study may provide a basis for future studies to explore how lean practice can enhance safety risk management in OSC. In the main, future studies are recommended to develop a decision-making model for analysis and selection of the most appropriate LMPs for safety improvement in OSC. However, some limitations of the research are worth acknowledging. First, the study provides findings for safety risk management using lean practice in the context of Malawi. However, due to varying economic and social landscape in different countries, generalizability of the study findings may be limited. Regardless, future comparative studies may unravel such differences. Second, since OSC is still in its embryotic development in Malawi, a thin line existed between OSC contractors from whom data was collected and general contractors. Moreover, most of the respondents had a higher cumulative experience in general construction than OSC. As such, some respondents’ experiences with LMPs may have been based more on general construction. Regardless, the study provides useful generic findings regarding lean practice for safety risk management in OSC in the context of countries is a new phenomenon.

Author Contributions

Conceptualization, W.S. and F.E.; methodology, W.S. and F.E; validation, W.S. and F.E; formal analysis, W.S. and F.E.; data curation, W.S; writing—original draft preparation, W.S; writing—review and editing, W.S.; supervision, F.E. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The original contributions presented in the study are included in the article, further inquiries can be directed to the corresponding author.

Acknowledgments

The authors would like to acknowledge that the text was written by the authors without the use of AI text generator systems.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Wuni, I.B.; Shen, G.Q. Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies. J. Clean. Prod 2020, 249, 119347. [CrossRef]
  2. Ayinla K.O.; Cheung, F; Tawil, A. Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system. Constr. Innov. 2019, 20, 223-246, . [CrossRef]
  3. Chatzimichailidou, M. and Ma, Yue. Using BIM in the safety risk management of modular construction. Saf. Sci. 2022, 154, 105852. [CrossRef]
  4. Wuni, I.B.; Shen, G.P.Q.; Mahmud, A.T. Critical risk success factors in the application of modular integrated construction: a systematic review. Int. J. Constr. Manag. 2022, 22, 133-147, . [CrossRef]
  5. Lu, N.; Korman, T. Implementation of building information modeling (BIM) in modular construction: Benefits and challenges. In: In Constr. Res. Congr. 2010, 1136–1145. [CrossRef]
  6. Lessing, J. Industrialised House Building – Conceptual orientation and strategic perspectives- Lund University (Media – Tryck. 2015. Available online: https://www.semanticscholar.org/paper/Industrialised-House-Building-Conceptual-and-Lessing/0c9a3e51bee96389ea85efc2de7bf71a4e2385cb (accessed on 9 June 2021).
  7. HM Government. The Construction Playbook. Cabinet Office. 2020. Available online: https://www.gov.uk/government/publications/the-construction-playbook (accessed 19 July 2024).
  8. Gibb, A. Standardization and pre-assembly-distinguishing myth from reality using case study research. J. Constr. Manag. Econ. 2001, 19, 307-315. [CrossRef]
  9. Smith, R.E. Off-site construction implementation resources: Off-site and modular construction explained. National institute of building services; University of Utah, 2016.
  10. Jonsson, H.; Rudberg, M. Production System Classification Matrix: Matching Product Standardization and Production-System Design. J. Constr. Eng. Manag. 2015, 141. [CrossRef]
  11. Chatzimichailidou, M. M.; Whyte, J. Dealing with complexity in modular construction. In Proceedings of 8th International Conference on Mass Customisation and Personalization – Community of Europe (MCP-CE 2018), Novi Sad, Serbia, 19-21 September 2018; pp. 47-52.
  12. El-Abidi, K.M.A.; Ghazali, F.E.M. Motivations and limitations of prefabricated building: an overview. Applied Mech. Mat. 2015, 802, 668–675. [CrossRef]
  13. Jeong, G.; Kim, H.; Lee, H.; Park, M.; Hyun, H. Analysis of safety risk factors of modular construction to identify accident trends. J. Asian Archit. Build. Eng. 2021, 21, 1040-1052. [CrossRef]
  14. Ahn, S.; Crouch, L.; Kim, T.W.; Rameezdeen, R. Comparison of worker Safety risks between onsite and offsite construction methods: A site management perspective. J. Constr. Eng. Manag. 2020, 146, 1-11. [CrossRef]
  15. Bajjou, MS.; Chafi, A.; En-Nadi, A. The potential effectiveness of lean construction tools in promoting safety on construction sites. Int. J. Eng. Res. Africa. 2017, 33, 179-193. [CrossRef]
  16. Ghosh, S. Does Formal Daily Huddle Meetings Improve Safety Awareness. International Journal of Construction Education and Research 2014, 10, 285-299. [CrossRef]
  17. Carvajal-Arango, D.; Bahamon-Jaramillo, S.; Aristizabal-Monsalve, P.; Vasquez-Hernandez, A.; Botero, L.F.B. Relationships between lean and sustainable construction: Positive impacts of lean practices over sustainability during construction phase. J. Clean. Prod. 2019, 234, 1322-1337. [CrossRef]
  18. Kalyuni, M.; Wodajo, T. Application of a Design Method for Manufacture and Assembly. 2012. MSc Thesis. Chalmers University of Technology. Available online: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://publications.lib.chalmers.se/records/fulltext/164233.pdf (accessed 14 January 2024).
  19. Han, S.; Bouferguene, A.; Al-Hussein, M.; Hermann, U. 3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites. J. Constr. Engin. Manag. 2017, 143, 12. [CrossRef]
  20. Li, X.; Han, S.; Gül, M.; Al-Hussein, M. Automated post-3D visualization ergonomic analysis system for rapid workplace design in modular construction. Autom. Constr. 2019, 98, 160-174. [CrossRef]
  21. Franks, E. Safety and Health in Prefabricated Construction: A New Framework for Analysis. University of Washington, DC, Washington, 2018.
  22. Liu, Q.; Ye, G.; Feng, Y. Workers’ safety behaviors in the off-site manufacturing plan. Eng. Constr. Arch. Mang. 2019, 27, 765-784. [CrossRef]
  23. Goh, J.T.; Hu, S.; Fang, Y. Human-in-the-loop simulation for crane lift planning in modular construction on-site assembly. In proceedings of ASCE International Conference on Computing in Civil Engineering, Atlanta, United States of America, 17-19 June 2019, pp. 71-78.
  24. Vithanage, S.C.; Sing, M.; Davis, P. Systematic review on the identification of safety risks in off-site manufacturing (OSM). J. Eng. Des Technol. 2021, 20, 935-964. [CrossRef]
  25. Fardi, M.M.; Terouhid, S.A.; Kibert, C.J.; Hakim, H. Safety concerns related to modular/prefabricated building construction. Int. J. Inj. Control. Saf. Promot. 2017, 24, 10-23. [CrossRef]
  26. James, J.; Ikuma, L.H.; Nahmens, I.; Aghazadeh, F. The impact of kaizen on safety in modular home manufacturing. The International Journal of Advanced Manufacturing Technology. 2014, 70, 725-734. [CrossRef]
  27. Ikuma, L.H.; Nahmens, I.; James, J. Use of safety and lean integrated kaizen to improve performance in modular homebuilding. Journal of Construction Engineering and Management. J. Constr. Eng. Manag. 2011, 137, 551-560. [CrossRef]
  28. Kim, S.; Nussbaum, M.A.; Jia, B.C. Low back injury risks during construction with prefabricated (panelised) walls: effects of task and design factors. Ergon, 2011, 54, 60-71. [CrossRef]
  29. Soto, S.; Hubbard, B.; Hubbard, S. Exploring prefabrication facility safety in the U.S. Construction industry. In proceeding of Achieving Sustainable Construction Health and Safety, Lund, Sweden, 203 June 2014.
  30. Abas, N.H.; Blismas, N.; Lingard, H. Knowledge-based energy damage model for evaluating industrialised building systems (IBS) occupational health and safety (OHS) risk. 3rd International Conference on Civil and Environmental Engineering for Sustainability, IConCEES 2015.
  31. Mao, C.; Shen, L.; Tang, L. Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: two case studies of residential projects. Energy Build. 2013, 66, 165-176. [CrossRef]
  32. Banks, C.; Kotecha, R.; Curtis, J. Enhancing high-rise residential construction through design for manufacture and assembly – a UK case study. Proc Inst. Civ. Eng. Manag. Proc. Law. 2018, 171, 164–175. [CrossRef]
  33. Chen, K.; Lu, W. Design for Manufacture and Assembly Oriented Design Approach to a Curtain Wall System: A Case Study of a Commercial Building in Wuhan, China. Sustainability, 2018, 10, 221. [CrossRef]
  34. Soltaninejad, M; Fardhosseini, N.S.; Kim. Y.W. Safety climate and productivity improvement of construction workplaces through the 6S system: mixed-method analysis of 5S and safety integration. Int. J. Occup. Saf. Ergon. 2021. 28, 1811-1821. [CrossRef]
  35. Nahmens, I. and Ikuma, L. H. An Empirical Examination of the Relationship between Lean Construction and Safety in the Industrialized Housing Industry. LCJ. 2009, 1-12. Available online: chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://citeseerx.ist.psu.edu/document?repid=rep1&type=pdf&doi=122f24f2a78e0565bd990953accf9ce0ac1fbea2 (accessed 17 June 2023).
  36. Chileshe, N.; Njau, C.W; Kiptoo, B.; Macharia L.N.; Kavishe, N. Critical success factors for Public-Private Partnership (PPP) infrastructure and housing projects in Kenya. Int. J. Constr. Manag. 2020. 2, 1-12. [CrossRef]
  37. Osei-Kyei, R.; Chan, A.P.C.; Ameyaw, E.E. A fuzzy synthetic evaluation analysis of operational management critical success factors for public-private partnership infrastructure projects. Benchmark Int. J. 2017a, 24, 2092-2112. [CrossRef]
  38. Babaunde, S.O.; Perera, S.; Adeniyi, O. Identification of critical risk factors in public-private partnership project phases in developing countries: A case of Nigeria. Benchmark Int. J. 2019, 26, 334-335. [CrossRef]
  39. Prajogo, D.I.; Sohal, A.S. The multidimensionality of TQM practices in determining quality and innovation performance: an empirical examination. Technovation. 2004, 23, 443–453. [CrossRef]
  40. Tata, J.; Prasad, S.; Thorn, R. The influence of organisational structure on the effectiveness of TQM programs. J Manage Iss. 1999, 11, 440–453. [CrossRef]
  41. Bayhan, H.G.; Dermikesen, S.; Zhang, C.; Tezel, A. A lean construction and BIM interaction model for the construction industry. Prod. Plan. Control. 2021, 34, 1447-1474. [CrossRef]
  42. Hwang, B. G.; Shan, M.; Looi, K.Y. Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. J. Clean. Prod. 2018, 183, 183-193. [CrossRef]
  43. Ameyaw, E.E.; Chan, A.P.C. 2015. Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach. Expert Systems with Applications. 2015, 42, 5102-5116. [CrossRef]
  44. Enshassi, A.; Saleh, N.; Mohamed, S. Application level of lean construction techniques in reducing accidents in construction projects. J. Financ. Manag. Prop. Constr. 2019, 24, 274-293. [CrossRef]
  45. Babalola, O.; Ibem, E.O.; Ezema, I.C. Implementation of lean practices in the construction industry: a systematic review. Built Environ. 2019, 148, 34-43. [CrossRef]
  46. Wu, X.; Yuan, H.; Wang, G.; Li, S.; Wu, G. Impacts of Lean Construction on Safety Systems: A System Dynamics Approach. Int. J. Environ. Res. Public. Health. 2019, 16, 221. [CrossRef]
  47. Srahna et al. 2017.
  48. Aziz, R.F.; Hafez, S.M. Applying lean thinking in construction and performance improvement. Alex. Eng. J. 2013, 52, 679-695. [CrossRef]
  49. Ahmed, S.; Hossain, M.; Haq, I. Implementation of lean construction in the construction industry in Bangladesh: awareness, benefits and challenges. Int. J. Build. Pathol. Adapt. 2020, 39, 2396-4708. [CrossRef]
  50. Ansah, R.H.; Sorooshian, S. Effect of lean tools to control external environment risks of construction projects. Sustainable cities and society. 2017, 32, 348-356. [CrossRef]
  51. Bashir, A.M. A framework for utilising lean construction strategies to promote safety on construction sites. PhD Thesis, University of Wolverhampton. 2013. Available online: https://wlv.openrepository.com/handle/2436/297665 (accessed 3 September 2022).
  52. Taherdoost, H. Designing a Questionnaire for a Research Paper: A Comprehensive Guide to Design and Develop an Effective Questionnaire. Asian J. Manag. Sci. 2022, 11, 8-16. [CrossRef]
  53. Rowley J. Designing and using research questionnaires. Manage ResRev. 2014, 37, 308–330. [CrossRef]
  54. Chyung, S.Y.; Roberts, K.; Swanson, L.; Hankinson, A. Evidence-based Survey Design: The Use of a Midpoint on the Likert Scale. Int. Sci. Perf. 2017, 56, 15-23. [CrossRef]
  55. Ameyaw, E.E.; Chan, A.P.PC. Evaluation and ranking of risk factors in public–private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach. Expert systems with application. 2015, 42, 5102-5116. [CrossRef]
  56. Battaglia, P. Nonprobability Sampling. SAGE Publications, Thousand Oaks, CA, 2011.
  57. Cronbach, L. J. Coefficient alpha and the internal structure of tests. Psychometrika. 1951. 16, 297–334. [CrossRef]
  58. Surucu, L.; Maslakci, A. Validity and reliability in quantitative research. Business and management studies. Buss. Manag. Stud. Int. J. 2020, 8, 2694-2726. [CrossRef]
  59. Gel, Y.R.; Miao, W.; Gastwirth, J.L. Robust directed tests of normality against heavy-tailed alternatives. Computational Statistics and Data Analysis. 2007, 51, 2734-2746. [CrossRef]
  60. Field, A. Discovering Statistics Using IBM SPSS Statistics: And Sex and Drugs and Rock “N” Roll, 4th Edition. Sage, Los Angeles, 2013.
  61. Agumba, J.N.; Haupt, T.C. The influence of health and safety practices on health and safety performance outcomes in small and medium enterprise projects in the South African construction industry. J. S. Afri Inst. Civ. Eng. 2018, 60, 61–72. [CrossRef]
  62. Abrey, W.; Smallwood, J.J. The effects of unsatisfactory working conditions on productivity in the construction industry. Procedia Eng. 2014, 85, 3-9. [CrossRef]
  63. Nunnaly, J.C. An overview of psychological measurement. In Clinical Diagnosis of Mental Disorders. New York: Plenum Press. 1978. pp. 97-146.
  64. Noorzai, E. Evaluating lean techniques to improve success factors in the construction phase. Constr. Innov. 2023, 23, 622-639. [CrossRef]
  65. Aslam, M.; Gao, Z.; Smith, G. Exploring factors for implementing lean construction for rapid initial successes in construction. Journal of Cleaner Energy, 2020, 277.123295. [CrossRef]
  66. Bashir et al., 2017 .
  67. Zhang, X.; Mohandes, S.R. Occupational health and safety in green building construction projects: A holistic Z-numbers-based risk management framework. Journal of cleaner energy, 2020, 275, 1-18. [CrossRef]
  68. Zhu, Z.; Park, M.-W.; Koch, C.; Soltani, M.; Hammad, A.; Davari, K. Predicting movements of onsite workers and mobile equipment for enhancing construction site safety. Automation in Construction, 2016, 68, 95–101. [CrossRef]
  69. Soltanmohammadlou, N.; Sadeghi, S.; Hon, C.K.H.; Mokhtarpour-Khanghah, F. Real-time locating systems and safety in construction sites: A literature review. 2019, 117, 229-242. [CrossRef]
  70. Aisheh, Y.I.A.; Tayeh, B.A.; Alaloul, W.S.; Almalki, A. Health and safety improvement in construction projects: a lean construction approach. JOSE. 2021, 8, 1981-1993. [CrossRef]
  71. Pee, L.G. Affordances for sharing domain-specific and complex knowledge on enterprise social media. International Journal of Information Management, 2017, 43, 25–37. [CrossRef]
  72. Wandahl, S.; Pérez, C. T.; Salling, S.; Hansen, C. H.; Nielsen, M. K.; Nissen, T. Daily huddles’ effect on crew productivity. In Proceedings of the 31st Annual Conference of the International Group for Lean Construction (IGLC31). Lille, France. 2023, 1255–1266.
  73. Anerao, S.D.; Deshmukh, S.S. Waste minimization by lean construction technology. IRJET. 2016, 3, 1703-1707.
  74. Pestana, C.; Gambatese, J.A. Lean practices and safety performance. Construction Research Congress 2016. 2016. [CrossRef]
  75. Sarhan, S.; Fox, A. Barriers to Implementing Lean Construction in the UK Construction Industry. The Built & Human Environment Review, 2013, 6. Available online: https://www.researchgate.net/publication/263658667_Barriers_to_Implementing_Lean_Construction_in_the_UK_Construction_Industry (accessed 27 March 2023).
  76. Oladiran, O.J. An investigation into the usage of lean construction techniques in Nigeria. J. Constr. Proj. Manag. Innov. 2017, 17, 1712-1725. [CrossRef]
  77. Camuffo, A.; Stefano, F.D.; Paolino, C. Safety reloaded: Lean operations and high involvement work practices for sustainable workplace. J. Bus. Ethics. 2017, 143, 245-259. [CrossRef]
  78. Awada, M.A.; Lakkis, B.S.; Doughan, A.R.; Hamzeh, F. R. Influence of Lean Concepts on Safety in the Lebanese Construction Industry. In: Proc. 24th Ann. Conf. of the Int’l. Group for Lean Construction, Boston, MA, USA, sect.11. 2016. pp. 63–72.
  79. Cohen, W.M.; Nelson, R.R.; Walsh, J.P. Links and Impacts: The Influence of Public Research on Industrial R and D. Manag. Sci. 2002, 48, 1–23. [CrossRef]
Table 1. Lean management practices for safety improvement in OSC.
Table 1. Lean management practices for safety improvement in OSC.
Lean management technique Lean management practice Source
Daily huddle meetings Two-way communication [15,44,45,46,47,48,51]
Hazard identification and elimination
Information sharing
Review previous work
Identify good and bad practice
Two-way communication
First run studies Critical analysis of work methods
Use video files, photographs and illustrations to review work
Mistaking proofing Use of personal protective equipment
Use of hazard warning equipment
Use of safeguards
Visual inspection
Use of audible devices
Use of visual tools
5S housekeeping Organising
Cleanliness and orderliness
Improved circulation around the workplace
Eliminate emplacements
Improved visualization Use of graphical dashboards and digital billboards
Use of safety borders and demarcations
Standardise work procedure
Use of safety signs and labels
Use of lights for activities performed at night
Last planner system Providing necessary work equipment
Involvement of workers in safety planning
Eliminate all potential work constraints
Correlate work methods with workers’ abilities and skills
Schedule site activities and simultaneous supervision plan
Empower safety workers in schedule planning
Undertake pre-task hazard analysis
Select the most appropriate and safest method
Table 2. Respondents profile.
Table 2. Respondents profile.
Attribute Sub-attribute Responses % Responses
Professional roles Company director 28 25.5
Safety officer/manager 9 8.2
Project manager 29 26.4
Quantity surveyor 27 25.5
Sit engineer/agent 7 6.4
Site manager 1 0.9
General experience in construction 1-5 years 20 18.2
6-10 years 30 27.3
11-15 years 21 19.1
Over 15 years 32 29.1
Experience in OSC 1-5 years 33 30
6-10 years 35 31.8
11-15 years 16 14.5
Over 15 years 19 17.3
Size of company Small 29 26.4
Medium 47 42.7
Large 27 24.5
Work undertaken by company Building 22 21.4
Civil 14 13.6
Building and Civil 67 65
Table 3. Ranking of lean management practices.
Table 3. Ranking of lean management practices.
Code LMPs MS SD Rank Shapiro-Wilk test (p- value) Kruskal-Walli’s test (p- value)
LMP1 Use of personal protective equipment 4.41 0.619 1 0.001 0.311
LMP2 Involvement of workers in safety planning 4.35 0.652 2 0.001 0.897
LMP3 Providing necessary work equipment 4.30 0.639 3 0.001 0.305
LMP4 Use of hazard warning equipment 4.30 0.725 4 0.001 0.321
LMP5 Critical analysis of work methods 4.28 0.569 5 0.001 0.726
LMP6 Two-way communication 4.28 0.569 6 0.001 0.975
LMP7 Use of safeguards 4.28 0.736 7 0.001 0.403
LMP8 Visual inspection 4.25 0.606 8 0.001 0.780
LMP9 Illumination 4.25 0.637 9 0.001 0.603
LMP10 Use video files, photographs and illustrations to review work 4.25 0.670 10 0.001 0.833
LMP11 Organising 4.25 0.532 11 0.001 0.427
LMP12 Use of graphical dashboards and digital billboards 4.24 0.633 12 0.001 0.318
LMP13 Use of audible devices 4.23 0.675 13 0.001 0.128
LMP14 Improved circulation around the workplace 4.23 0.689 14 0.001 0.559
LMP15 Cleanliness and orderliness 4.23 0.703 15 0.001 0.920
LMP16 Hazard identification and elimination 4.23 0.716 16 0.001 0.511
LMP17 Use of safety borders and demarcations 4.23 0.770 17 0.001 0.027
LMP18 Information sharing 4.22 0.576 18 0.001 0.866
LMP19 Eliminate all potential work constraints 4.22 0.625 19 0.001 0.452
LMP20 Correlate work methods with workers’ abilities and skills 4.22 0.685 20 0.001 0.104
LMP21 Review previous work 4.21 0.618 21 0.001 0.511
LMP22 Identify good and bad practice 4.21 0.635 22 0.001 0.378
LMP23 Select the most appropriate and safest method 4.20 0.632 23 0.001 0.331
LMP24 Eliminate emplacements 4.20 0.705 24 0.001 0.422
LMP25 Standardise work procedure 4.19 0.482 25 0.001 0.713
LMP26 Use of visual tools 4.19 0.728 26 0.001 0.542
LMP27 Use of safety signs and labels 4.18 0.751 27 0.001 0.159
LMP28 Schedule site activities and simultaneous supervision plan 4.17 0.596 28 0.001 0.606
LMP29 Empower and involve safety workers in schedule planning 4.17 0.663 29 0.001 0.783
LMP30 Undertake pre-task hazard analysis 4.14 0.715 30 0.001 0.852
Table 4. Average mean scores for ranking LMTs.
Table 4. Average mean scores for ranking LMTs.
Code LMTs/LMPs Mean SD LMP rank Av. MS Av. SD LMT rank
Mistaking proofing
LMP1 Use of personal protective equipment 4.41 0.619 1 4.33 0.682 1
LMP4 Use of hazard warning equipment 4.30 0.725 4
LMP7 Use of safeguards 4.28 0.736 7
LMP8 Visual inspection 4.25 0.606 8
LMP13 Use of audible devices 4.23 0.675 13
LMP26 Use of visual tools 4.19 0.728 26
First run studies
LMP5 Critical analysis of work methods 4.28 0.569 5 4.27 0.620 2
LMP10 Use video files, photographs and illustrations to review work 4.25 0.670 10
Daily huddle meeting
LMP6 Two-way communication 4.28 0.569 6 4.23 0.623 3
LMP16 Hazard identification and elimination 4.23 0.716 16
LMP18 Information sharing 4.22 0.576 18
LMP21 Review previous work 4.21 0.618 21
LMP22 Identify good and bad practice 4.21 0.635 22
5S housekeeping
LMP11 Organising 4.25 0.532 11 4.23 0.657 4
LMP14 Improved circulation around the workplace 4.23 0.689 14
LMP15 Cleanliness and orderliness 4.23 0.703 15
LMP24 Eliminate emplacements 4.20 0.705 24
Last planner system 4.22 0.651 5
LMP2 Involvement of workers in safety planning 4.35 0.652 2
LMP3 Providing necessary work equipment 4.30 0.639 3
LMP19 Eliminate all potential work constraints 4.22 0.625 19
LMP20 Correlate work methods with workers’ abilities and skills 4.22 0.685 20
LMP23 Select the most appropriate and safest method 4.20 0.632 23
LMP28 Schedule site activities and simultaneous supervision plan 4.17 0.596 28
LMP29 Empower safety workers in schedule planning 4.17 0.663 29
LMP30 Undertake pre-task hazard analysis 4.14 0.715 30
Improved visualisation
LMP9 Use of lights for activities performed at night 4.25 0.637 9 4.22 0.655 6
LMP12 Use of graphical dashboards and digital billboards 4.24 0.633 12
LMP17 Use of safety borders and demarcations 4.23 0.770 17
LMP25 Standardise work procedure 4.19 0.482 25
LMP27 Use of safety signs and labels 4.18 0.751 27
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.
Prerpints.org logo

Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.

Subscribe

© 2024 MDPI (Basel, Switzerland) unless otherwise stated