ARTICLE
|
doi:10.20944/preprints201805.0195.v1
Subject:
Engineering,
Architecture, Building And Construction
Keywords:
petrochemical projects; critical factors; schedule delay
Online: 14 May 2018 (12:23:50 CEST)
ARTICLE
|
doi:10.20944/preprints202403.1856.v1
Subject:
Engineering,
Civil Engineering
Keywords:
BIM; rebar work; bar bending schedule; special length; automation
Online: 3 April 2024 (05:55:08 CEST)
ARTICLE
|
doi:10.20944/preprints202004.0162.v1
Subject:
Engineering,
Civil Engineering
Keywords:
Earned Value Method – EVM; time variances; cost variances; schedule
Online: 9 April 2020 (16:25:36 CEST)
ARTICLE
|
doi:10.20944/preprints201911.0188.v1
Subject:
Engineering,
Civil Engineering
Keywords:
Earned Value Method (EVM); time variances; cost variances; schedule
Online: 16 November 2019 (00:54:47 CET)
ARTICLE
|
doi:10.20944/preprints201609.0090.v1
Subject:
Engineering,
Civil Engineering
Keywords:
hauling operations; optimum schedule; energy consumption; CO2 emission; hauler
Online: 26 September 2016 (10:12:16 CEST)
ARTICLE
|
doi:10.20944/preprints201707.0009.v1
Subject:
Engineering,
Electrical And Electronic Engineering
Keywords:
pumped storage system; coordinated PSS with wind-thermal generation; uncoordinated PSS; risk; mixed integer programming; thermal unit commitment schedule; PSS modes schedule
Online: 6 July 2017 (07:46:31 CEST)
ARTICLE
|
doi:10.20944/preprints202409.0524.v1
Subject:
Medicine And Pharmacology,
Dietetics And Nutrition
Keywords:
football; soccer; body composition; exercise time of day; training schedule
Online: 6 September 2024 (10:55:46 CEST)
ARTICLE
|
doi:10.20944/preprints202303.0103.v1
Subject:
Computer Science And Mathematics,
Applied Mathematics
Keywords:
single machine; single breakdown; schedule; flowtime; stochastic optimization; online optimization
Online: 6 March 2023 (13:00:04 CET)
ARTICLE
|
doi:10.20944/preprints202107.0069.v1
Subject:
Engineering,
Automotive Engineering
Keywords:
fresh agricultural products; harvest schedule; stochastic programming; sample-average approximation
Online: 2 July 2021 (15:44:52 CEST)
ARTICLE
|
doi:10.20944/preprints201701.0010.v1
Subject:
Medicine And Pharmacology,
Neuroscience And Neurology
Keywords:
Haemophilus influenza; Neisseria meningitidis; meningitis; vaccine efficacy evaluation; immunization schedule.
Online: 2 January 2017 (18:14:59 CET)
ARTICLE
|
doi:10.20944/preprints202402.1291.v1
Subject:
Business, Economics And Management,
Finance
Keywords:
discount function; amortizing loans; outstanding balance; amortization schedule; compound interest; simple interest.
Online: 22 February 2024 (09:50:36 CET)
ARTICLE
|
doi:10.20944/preprints202309.0012.v1
Subject:
Business, Economics And Management,
Business And Management
Keywords:
Project Management; Artificial Intelligence (AI); Project Schedule Management; Project Cost Management; Project Risk Management
Online: 1 September 2023 (11:34:59 CEST)
ARTICLE
|
doi:10.20944/preprints202408.2218.v1
Subject:
Engineering,
Industrial And Manufacturing Engineering
Keywords:
operations research; production planning; master production schedule; aggregate demand; car parts manufacturing; mixed-integer linear programming
Online: 30 August 2024 (11:16:13 CEST)
ARTICLE
|
doi:10.20944/preprints202402.1316.v1
Subject:
Engineering,
Transportation Science And Technology
Keywords:
flight scheduling; airport congestion; flight delays; schedule optimization; simulation of arrival and departure processes; runway capacity
Online: 22 February 2024 (13:25:41 CET)
ARTICLE
|
doi:10.20944/preprints202112.0306.v2
Subject:
Medicine And Pharmacology,
Oncology And Oncogenics
Keywords:
learning health system; ambulatory clinic; block schedule; disease site teams; interdisciplinary care; cancer operations; oncology value stream
Online: 26 April 2022 (04:37:15 CEST)
ARTICLE
|
doi:10.20944/preprints202003.0363.v1
Subject:
Engineering,
Civil Engineering
Keywords:
Artificial Neural Network; Schedule Performance Index (SPI); Cost Performance Index (CPI); To Complete Cost Performance Indicator (TCPI); Predicting; Models
Online: 24 March 2020 (14:49:20 CET)
ARTICLE
|
doi:10.20944/preprints201706.0073.v1
Subject:
Engineering,
Electrical And Electronic Engineering
Keywords:
optimization schedule; transactive energy; DC residential distributed system; living homes, DC droop control; Centralized energy management system, electrical price
Online: 16 June 2017 (04:33:36 CEST)
ARTICLE
|
doi:10.20944/preprints201908.0059.v1
Subject:
Biology And Life Sciences,
Forestry
Keywords:
deciduous forest; female; forest bathing; forest therapy; Positive and Negative Affect Schedule; Profile of Mood States; Restorative Outcome Scale; restoration; Shinrin-Yoku; snow covered forest; Subjective Vitality Scale; winter
Online: 5 August 2019 (08:56:32 CEST)